Planning applicationANG/25/00569/FULL

Field Immediately West Of North Mains Of Cononsyth Farm Cononsyth Arbroath

Application RefusedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

438 of 559 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 121 records from that period are still being added or checked.

Proposals and decisions come from Angus Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

21 October 2025

Validated

24 October 2025

Planning Signals

4 detected traits

Works
House Extension
Specific
Associated InfrastructureParking AccessWind Turbine
Application Insights

No form insights available yet.

AI summary

Replacement wind turbine proposal: install an 86.5m turbine with crane hardstanding, track extension and grid connection, repositioning an existing 66.7m turbine.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ANG/25/00569/FULL

Field Immediately West Of North Mains Of Cononsyth Farm Cononsyth Arbroath

Application RefusedRenewable Energy, EV & Heat PumpsReceived Angus Council

Replacement wind turbine proposal: install an 86.5m turbine with crane hardstanding, track extension and grid connection, repositioning an existing 66.7m turbine.

Reference
ANG/25/00569/FULL
Address
Field Immediately West Of North Mains Of Cononsyth Farm Cononsyth Arbroath
Status
Application Refused
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
Angus Council
Received
Validated
Last scraped
Record created
Latitude
56.6105
Longitude
-2.7009

Plain-language summary

Replacement wind turbine proposal: install an 86.5m turbine with crane hardstanding, track extension and grid connection, repositioning an existing 66.7m turbine.

As filed with the council

Erection of a single 86.5m wind turbine with associated crane hardstanding, access track extension, and grid connection infrastructure (replacement and repositioning of existing 66.7m wind turbine)