Overview
Why it’s worth watching
A refused application to replace a 66.7m wind turbine with an 86.5m turbine is a material renewable-energy change with photomontage evidence of landscape impact.
- Today
- An existing 66.7m wind turbine.
- Proposed
- A replacement, repositioned 86.5m wind turbine, with crane hardstanding, an access track extension and grid connection infrastructure.
- Size
- 66.7 m existing turbine height · 86.5 m proposed turbine height
- Stage
- Decided: Application Refused.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application was for a single 86.5m wind turbine, replacing and repositioning an existing 66.7m turbine. It also included crane hardstanding, an extension to the access track and grid connection infrastructure. The application was refused.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
438 of 559 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 121 records from that period are still being added or checked.
Proposals and decisions come from Angus Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ANG/25/00569/FULL?
Follow it on City Scope. This page is checked against the Angus Council planning register and shows the latest status, decision and documents for ANG/25/00569/FULL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Angus Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A single 86.5m wind turbine would replace and be repositioned from the existing 66.7m turbine.
- 02
Crane hardstanding would be built.
- 03
The access track would be extended.
- 04
Grid connection infrastructure would be installed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- House Extension
- Associated Infrastructure
- Parking Access
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “associated crane hardstanding, access track extension, and grid connection infrastructure”
- House Extension
- “extension”
- Parking Access
- “access track extension”
- Wind Turbine
- “Erection of a single 86.5m wind turbine”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received21 Oct 2025
- Validated24 Oct 2025The council has everything it needs.
- Comments closed14 Nov 2025Usual deadline. Late comments may still count.
- Target decision24 Dec 20252-month target for local developments.
- DecisionApplication Refused
The record
- Reference
- ANG/25/00569/FULL
- Address
- Field Immediately West Of North Mains Of Cononsyth Farm Cononsyth Arbroath
- Status
- Application Refused
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Angus Council
- Received
- Validated
- Last checked
- Added to City Scope