Planning applicationANG/26/00178/EIASCR

Parkconon Farm Repowering Colliston Arbroath

EIA Not RequiredWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

438 of 559 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 121 records from that period are still being added or checked.

Proposals and decisions come from Angus Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

16 March 2026

Validated

18 March 2026

Planning Signals

2 detected traits

Specific
Eia ScreeningWind Turbine
Application Insights

No form insights available yet.

AI summary

Repowering works proposed for an existing wind turbine, replacing the current machine with a Vestas V52 model to boost output.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ANG/26/00178/EIASCR

Parkconon Farm Repowering Colliston Arbroath

EIA Not RequiredRenewable Energy, EV & Heat PumpsReceived Angus Council

Repowering works proposed for an existing wind turbine, replacing the current machine with a Vestas V52 model to boost output.

Reference
ANG/26/00178/EIASCR
Address
Parkconon Farm Repowering Colliston Arbroath
Status
EIA Not Required
Category
Renewable Energy, EV & Heat Pumps
Impact scale
5/10
Authority
Angus Council
Received
Validated
Last scraped
Record created
Latitude
56.6031
Longitude
-2.687

Plain-language summary

Repowering works proposed for an existing wind turbine, replacing the current machine with a Vestas V52 model to boost output.

As filed with the council

Wind turbine repowering