Planning application · ANG/26/00188/FULL
67m wind turbine proposed west of Craignathro Farm.
Field 430 West Of Craignathro Farm Forfar
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 6/10
- House Extension
- Wind Turbine
- Wind Turbine Count 2
Overview
Why it’s worth watching
Wind turbine replacement of significant scale and potential visual impact on surrounding area.
- Today
- An existing 33m wind turbine.
- Proposed
- Replace and reposition it with a single 67m turbine, with associated access and grid works.
- Size
- 67 m proposed turbine height · 33 m existing turbine height
- Stage
- Decided on 24 Aug 2026: Application Withdrawn.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposed replacing and repositioning an existing 33m wind turbine with a single 67m turbine. It also included crane hardstanding, an access track extension and grid connection infrastructure. The application was withdrawn.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
438 of 559 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 121 records from that period are still being added or checked.
Proposals and decisions come from Angus Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ANG/26/00188/FULL?
Follow it on City Scope. This page is checked against the Angus Council planning register and shows the latest status, decision and documents for ANG/26/00188/FULL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Angus Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A single 67m wind turbine was proposed, replacing and repositioning the existing 33m turbine.
- 02
Crane hardstanding and an extension to the access track were proposed.
- 03
Grid connection infrastructure was proposed.
Questions
What happened to the application?
It was withdrawn.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- House Extension
- Wind Turbine
- Wind Turbine Count 2
What each tag is based on
- House Extension
- “extension”
- Wind Turbine
- “Erection of a single 67m wind turbine”
- Wind Turbine Count 2
- “replacement and repositioning of existing 33m wind turbine”
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 24 August 2026.
- Received25 Mar 2026
- Validated31 Mar 2026The council has everything it needs.
- Comments closed21 Apr 2026Usual deadline. Late comments may still count.
- Target decision31 May 20262-month target for local developments.
- Decision24 Aug 2026Application Withdrawn.
The record
- Reference
- ANG/26/00188/FULL
- Address
- Field 430 West Of Craignathro Farm Forfar
- Status
- Withdrawn
- Council decision
- Application Withdrawn
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- Angus Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





