Planning application · ANG/26/00614/FULM
Proposed 76.5m wind turbine replacing an existing one, plus a 20MW battery storage system with containers, control building, transformer and access works.
Field Immediately West Of North Mains Of Cononsyth Farm Cononsyth Arbroath
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- Renewable Energy, EV & Heat Pumps
- Medium 6/10
- Hardstanding
- Ancillary Structure
- Parking Access
- Wind Turbine
- Wind Turbine Count 1
Overview
Why it’s worth watching
A major renewable energy scheme with a replacement turbine and 20MW battery storage has clear infrastructure and local landscape consequences.
The council writes only to properties within 20 metres of an application site. Who is told
As lodged with the council
Erection of a single 76.5m wind turbine with associated crane hardstanding, access track extension, and grid connection infrastructure (replacement and repositioning of existing 66.7m wind turbine) and installation of 20MW battery storage system (BESS) comprising storage containers, control and switch room building, transformer, fencing, CCTV, catchment tank, access, parking and associated works
The headline is a plain-English summary written with AI from the council record.
Keep reading
Official records · coverage in progress
438 of 559 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 121 records from that period are still being added or checked.
Proposals and decisions come from Angus Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ANG/26/00614/FULM?
Follow it on City Scope. This page is checked against the Angus Council planning register and shows the latest status, decision and documents for ANG/26/00614/FULM. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Angus Council planning portal.
The impact
What the application says.
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Hardstanding
- Ancillary Structure
- Parking Access
- Wind Turbine
- Wind Turbine Count 1
What each tag is based on
- Hardstanding
- “crane hardstanding”
- Ancillary Structure
- “control and switch room building”, “fencing, CCTV, catchment tank, access, parking and associated works”
- Parking Access
- “access track extension”, “access, parking”
- Wind Turbine
- “single 76.5m wind turbine”
- Wind Turbine Count 1
- “single 76.5m wind turbine”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments are open until 2 December.
- Received2 Nov 2026
- Validated11 Nov 2026The council has everything it needs.
- Comments close (next)2 Dec 2026Usual deadline, 21 days after validation.
- Target decision11 Jan 20272-month target for local developments.
- DecisionNot yet
The record
- Reference
- ANG/26/00614/FULM
- Address
- Field Immediately West Of North Mains Of Cononsyth Farm Cononsyth Arbroath
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- Angus Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







