Skip to content

Planning application · BROMLEY/26/03865/FPA

BROMLEY/26/03865/FPAValidWorth watching

Sensory garden with textured path, archways, activity boards, sound apparatus, planters, wooden gazebo, plus boundary fence mesh, ivy and replacement bow top fence.

PERRY HALL PRIMARY SCHOOL, PERRY HALL ROAD, ORPINGTON, BR6 0EF

St Mary Cray ward · Bromley

Category
Landscaping, Gardens & Boundaries
Scale
Small 3/10
Tags
  • Boundary Fence Installation
  • Education
  • Education School
  • Gazebo
  • Outdoor Classroom

Overview

Why it’s worth watching

A primary school proposes a sensory garden and outdoor teaching space with specific inclusive-design features and boundary works, a material change to a local school facility.

Stage
Comments closed. Decision due by 27 Nov 2026.
Existing & Proposed East Facing Elevation Plans - 06 of 12

As lodged with the council

Installation of a sensory garden at land to the front of the school for an inclusive environment for children with communication, social and sensory needs consisting of a sensory path constructed from different textured and coloured materials with small sections covered by coloured archways, lined with activity boards, apparatus that create sound, a sound tube and planters with herbs and textured plants to enhance natural and sensory provision. A wooden gazebo with coloured panels to allow for outdoor teaching. Addition of privacy mesh and ivy to the existing front boundary fence and replacement internal green bow top fence to create a private and secure space for the children

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application BROMLEY/26/03865/FPA?

Follow it on City Scope. This page is checked against the Bromley planning register and shows the latest status, decision and documents for BROMLEY/26/03865/FPA. To comment on the application, use the Bromley planning portal.