Skip to content

Planning application · CITY-OF-LONDON/25/01774/LBC

CITY-OF-LONDON/25/01774/LBCDecided

Internal Library refurbishment: joinery, bookshelf and lighting alterations, new security screen, power and floor finishes.

Library Barbican Arts and Conference Centre Silk Street London EC2Y 8DS

Cripplegate ward · City of London

Category
Internal Works & Accessibility
Scale
Medium 5/10

Overview

GLA last reported: Approved (18 August 2026). The council's current status takes precedence; its result list has not verified these decision details. Source report captured .

Type
Listed building consent
Stage
Decided: Decided.

As lodged with the council

Internal refurbishment works to the Library, comprising: a) Removal and storage of original joinery items to Children's Library b) Removal of non-original joinery and floor finishes c) Alterations to original bookshelves d) Additional joinery to complement existing e) Installation of new mesh security screen and door access controls f) Additional power provision and cabinet g) Alterations to signage h) Alterations to non-original lighting built into joinery i) New floor finishes throughout public areas of the Library

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application CITY-OF-LONDON/25/01774/LBC?

Follow it on City Scope. This page is checked against the City of London planning register and shows the latest status, decision and documents for CITY-OF-LONDON/25/01774/LBC. To comment on the application, use the City of London planning portal.