Skip to content

Planning application · CITY-OF-LONDON/26/00612/FULL

CITY-OF-LONDON/26/00612/FULLDecided

New hard and soft landscaping for sculpture court with paving, ramps, steps, planting beds, seating and lighting; facade glazing upgrades.

Barbican Arts and Conference Centre Silk Street London EC2Y 8DS

Cripplegate ward · City of London

Category
Landscaping, Gardens & Boundaries
Scale
Medium 5/10

Overview

GLA last reported: Approved (18 September 2026). The council's current status takes precedence; its result list has not verified these decision details. Source report captured .

Type
Full planning permission
Stage
Decided: Decided.

As lodged with the council

New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, and lighting, proposed parameters for temporary structures and artworks to facilitate continued use of the sculpture court for art installations, works to the staff spaces facades to upgrade glazing and frames to level 2 and other associated works.

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application CITY-OF-LONDON/26/00612/FULL?

Follow it on City Scope. This page is checked against the City of London planning register and shows the latest status, decision and documents for CITY-OF-LONDON/26/00612/FULL. To comment on the application, use the City of London planning portal.