Skip to content

Planning application · CITY-OF-LONDON/26/00613/LBC

CITY-OF-LONDON/26/00613/LBCDecided

Sculpture court landscaping with paving, ramps, steps, planting beds, seating, lighting and fountain; staff space reconfiguration and facade glazing upgrades.

Barbican Arts and Conference Centre Silk Street London EC2Y 8DS

Cripplegate ward · City of London

Category
Landscaping, Gardens & Boundaries
Scale
Medium 5/10

Overview

GLA last reported: Approved (18 September 2026). The council's current status takes precedence; its result list has not verified these decision details. Source report captured .

Type
Listed building consent
Stage
Decided: Decided.

As lodged with the council

New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, lighting, and drinking water fountain. Works to the staff spaces to include internal reconfiguration, new WCs, showers, and kitchenette, works to the facades to upgrade glazing and frames at level 2. Upgrade and replacement fixtures, fittings and finishes and other associated works.

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application CITY-OF-LONDON/26/00613/LBC?

Follow it on City Scope. This page is checked against the City of London planning register and shows the latest status, decision and documents for CITY-OF-LONDON/26/00613/LBC. To comment on the application, use the City of London planning portal.