Planning application · CITY-OF-LONDON/26/00707/LBC
Reconfiguration and upgrade of concert hall backstage areas, including dressing rooms, artist lounge, showers, fire safety upgrades, rehearsal space and storage.
Art Gallery Barbican Arts and Conference Centre Silk Street London EC2Y 8DS
- Internal Works & Accessibility
- Medium 5/10
Overview
GLA last reported: Approved (15 July 2026). The council's current status takes precedence; its result list has not verified these decision details. Source report captured .
- Type
- Listed building consent
- Stage
- Decided: Decided.
As lodged with the council
Reconfiguration and upgrade of the concert hall backstage areas to include the amalgamation of smaller dressing rooms, changing spaces and support spaces; the reconfiguration of the artist lounge and bar ; rationalisation of showers to provide a wheelchair accessible dressing room with an en-suite WC and shower; fire safety upgrades, update layout of a rehearsal spaces, and provision of fire rated storage space and other associated works throughout.
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application CITY-OF-LONDON/26/00707/LBC?
Follow it on City Scope. This page is checked against the City of London planning register and shows the latest status, decision and documents for CITY-OF-LONDON/26/00707/LBC. To comment on the application, use the City of London planning portal.
The impact
What it involves.
Where it’s at
The council has decided.
- Received15 May 2026
- Validated15 May 2026The council has everything it needs.
- Comments closed5 Jun 2026Usual deadline. Late comments may still count.
- Target decision10 Jul 20268-week target for minor and other applications.
- DecisionDecided
Planning terms
- Listed building consent
- Needed for any work that changes the character of a listed building, inside or out. Separate from planning permission.
The record
- Reference
- CITY-OF-LONDON/26/00707/LBC
- Address
- Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
- Status
- Decided
- Category
- Internal Works & Accessibility
- Impact scale
- 5/10
- Authority
- City of London
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Cripplegate
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
