Planning application · CITY-OF-LONDON/26/00967/FULL
External lighting scheme to replace and upgrade lighting on St Paul's Cathedral and adjacent buildings, with floodlights replaced by low level safety lighting.
St Pauls Cathedral, 4 St Pauls Churchyard, Juxon House and Chapter House St Pauls Churchyard, 1 Paternoster Square, Paternoster House 65 St Pauls Churchyard, St Pauls Cathedral School, 2 New Change, 1 Carter Lane, Pvmnt O/s Carter Lane Gdns
- External Lighting & Fixtures
- Medium 5/10
- Education
Overview
Why it’s worth watching
Major external lighting scheme affecting St Paul's Cathedral and surrounding buildings, with floodlights removed from the churchyard.
- Type
- Full planning permission
- Stage
- Comments closed. Decision due by 27 Nov 2026.
As lodged with the council
External lighting scheme to replace and upgrade the lighting on and to St Paul's Cathedral including on buildings adjacent to St Paul's Cathedral (4 St Paul's Churchyard, Juxon House, Chapter House, 1 Paternoster Square, Paternoster House, St Paul's Cathedral School and One Carter Lane), installed on columns and low level lighting safety lighting to replace floodlights to St Paul's Cathedral Churchyard.
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application CITY-OF-LONDON/26/00967/FULL?
Follow it on City Scope. This page is checked against the City of London planning register and shows the latest status, decision and documents for CITY-OF-LONDON/26/00967/FULL. To comment on the application, use the City of London planning portal.
The impact
What the application says.
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Education
What each tag is based on
- Education
- “St Pauls Cathedral, 4 St Pauls Churchyard, Juxon House And Chapter House St Pauls Churchyard, 1 Paternoster Square, Paternoster House 65 St Pauls Churchyard, St Pauls Cathedral School, 2 New Change, 1 Carter Lane, Pvm...”
Drawings
Where the site is.
All documents (101)
- 26_00967_FULL-LOCATIONPLAN-1789654.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_CHAPTER_HOUSE-1789656.pdf
- 26_00967_FULL-LIGHTING_CONTROL_SYSTEM_SCHEMATIC__PRELIMINARY_-1789657.pdf
- 26_00967_FULL--1789658.pdf
- 26_00967_FULL-LIGHTING_TO_SOUTH_FACADE_EXISTING_LIGHTING_COLUMN_TO_ST._PAUL_S_CHURCHYARD_REF.-1789659.pdf
- 26_00967_FULL-LIGHTING_TO_SOUTH_FACADE_NEW_LIGHTING_COLUMN_TO_ST._PAUL_S_CHURCHYARD_REF._XA_XB-1789660.pdf
- 26_00967_FULL-LIGHTING_TO_NORTH_FACADE_NEW_LIGHTING_COLUMN_TO_ST._PAUL_S_CATHEDRAL_CHURCHYARD-1789661.pdf
- 26_00967_FULL-LIGHTING_TO_NORTH_PORTICO_1_PATERNOSTER_SQUARE_REF._XA-1789662.pdf
- 26_00967_FULL-LIGHTING_TO_NORTH_FACADE_CHAPTER_HOUSE_REF._XA-1789663.pdf
- 26_00967_FULL-LIGHTING_TO_NORTH_FACADE_BELL_TOWER_JUXON_HOUSE_REF._XB1-1789664.pdf
- 26_00967_FULL-LIGHTING_TO_EAST_FACADE_FROM_ST._PAUL_S_CHOIR_SCHOOL_ROOF_REF._XA-1789665.pdf
- 26_00967_FULL-LIGHTING_TO_WEST_FACADE_1-4_ST._PAUL_S_CHURCHYARD_REFS._XA__XB__XB1-1789666.pdf
- 26_00967_FULL-LIGHTING_TO_WEST_FACADE_JUXON_HOUSE_REFS._XA__XB___XB1-1789668.pdf
- 26_00967_FULL-LIGHTING_TO_DOME__LANTERN_AND_CROSS_1_CARTER_LANE_REFS._XK__XN_AND_XP-1789670.pdf
- 26_00967_FULL-LIGHTING_TO_DOME__LANTERN_AND_CROSS_1_PATERNOSTER_SQUARE_REFS._XK__XN_AND_XP-1789672.pdf
- 26_00967_FULL-LIGHTING_TO_DOME__LANTERN_AND_CROSS_1_PATERNOSTER_SQUARE_REFS._XK__XN_AND_XP-1789674.pdf
- 26_00967_FULL-LIGHTING_TO_DOME__LANTERN_AND_CROSS_CATHEDRAL_ROOF_WEST_END_REFS._XK__XN_AND_XP-1789676.pdf
- 26_00967_FULL-LIGHTING_TO_DOME__LANTERN_AND_CROSS_CATHEDRAL_ROOF_EAST_END_REFS._XK__XN_AND_XP-1789677.pdf
- 26_00967_FULL-LIGHTING_TO_OUTER_PERISTYLE_AND_TAMBOUR_CATHEDRAL_ROOF_REF._XH-1789678.pdf
- 26_00967_FULL-LIGHTING_TO_BELL_AND_CLOCK_TOWER__EAST_ELEVATION__CATHEDRAL_ROOF_REF._XC-1789679.pdf
- 26_00967_FULL-LIGHTING_TO_BELL_AND_CLOCK_TOWER__NORTH___SOUTH_ELEVATIONS__CATHEDRAL_ROOF_REF.-1789680.pdf
- 26_00967_FULL-LIGHTING_TO_INNER_PERISTYLE_REF._XG-1789681.pdf
- 26_00967_FULL-LIGHTING_TO_STONE_GALLERY_REF._XJ-1789682.pdf
- 26_00967_FULL-LIGHTING_TO_GOLDEN_GALLERY_REF._XL-1789683.pdf
- 26_00967_FULL-LIGHTING_TO_UPPER_WEST_PORTICO_REF._XQ-1789684.pdf
- 26_00967_FULL-LIGHTING_TO_LOWER_WEST_PORTICO_REFS._XQ1_AND_YA-1789685.pdf
- 26_00967_FULL-LIGHTING_TO_BELL_TOWER_BELL_CHAMBER_REF._XD-1789686.pdf
- 26_00967_FULL-LIGHTING_TO_BELL_TOWER_LANTERN_REF._XD-1789688.pdf
- 26_00967_FULL-LIGHTING_TO_CLOCK_TOWER_CLOCK_TOWER_REF._XF1-1789691.pdf
- 26_00967_FULL-LIGHTING_TO_CLOCK_TOWER_LANTERN_REF._XD1-1789692.pdf
- 26_00967_FULL-LIGHTING_TO_EAST_END_WINDOW_REVEALS_REF._XR-1789693.pdf
- 26_00967_FULL-LIGHTING_TO_LANTERN_REF._XM-1789695.pdf
- 26_00967_FULL-LIGHTING_TO_NORTH_PORTICO_PATERNOSTER_HOUSE_REF._XA-1789696.pdf
- 26_00967_FULL-LIGHTING_TO_DOME_FROM_BELL___CLOCK_TOWERS_REF._XK-1789698.pdf
- 26_00967_FULL-LIGHTING_TO_EGRESS_PATHS_ST._PAUL_S_CATHEDRDAL_CHURCHYARD_GARDENS_REF._XZ-1789699.pdf
- 26_00967_FULL-LIGHTING_TO_NORTH_PORTICO_ENTRANCES__CHURCHYARD_GARDENS_REF._YB-1789702.pdf
- 26_00967_FULL-LIGHTING_TO_NORTH_AND_SOUTH_PORTICOES_REFURBISHED_LANTERNS_REF._XS-1789704.pdf
- 26_00967_FULL-HANDRAIL_LIGHTING_TO_SOUTH_PORTICO_STEPS_REF._XW1-1789706.pdf
- 26_00967_FULL-12113-DR-002-16_20260409-1789708.pdf
- 26_00967_FULL-LOGICAL_CONTROL_CHANNEL_SCHEDULE-1789710.pdf
- 26_00967_FULL-LIGHTING_EQUIPMENT_SPECIFICATION_EXTERIOR_LIGHTING-1789711.pdf
- 26_00967_FULL-HIGH_AND_LOW_LEVEL_LIGHTING_ARRANGEMENT_PRECINCT__ROOF__PERISTYLE__DOME_AND_LANT-1789712.pdf
- 26_00967_FULL-BLOCK_PLAN_OF_THE_SITE_INCLUDED_IN_ADDITIONAL_PLANS-1789713.pdf
- 26_00967_FULL-SOUTH_ELEVATION_LIGHTING_ARRANGEMENT-1789714.pdf
- 26_00967_FULL-WEST_ELEVATION_LIGHTING_ARRANGEMENT-1789715.pdf
- 26_00967_FULL-LIGHTING_TO_ST._AUGUSTINE_S_TOWER_LIGHTING_ARRANGEMENTS-1789716.pdf
- 26_00967_FULL-J100_NORTH_CHURCHYARD_WSI_V1.0-1789718.pdf
- 26_00967_FULL-LIGHTING_ASSESSMENT_INCLUDED_IN_CONDITION_ASSESSMENT_SHEETS-1789720.pdf
- 26_00967_FULL-OTHER_RELEVANT_INFORMATION_INCLUDED_IN_CONDITION_ASSESSMENT_SHEETS-1789721.pdf
- 26_00967_FULL-260325_SPC_EXT_LIGHT_HIA_A01_REDUCED_FILE_SIZE-1789722.pdf
- 26_00967_FULL-15172_ST._PAULS_CATHEDRAL_LIGHTING_EMBEDDED_CARBON_ASSESSMENT_REPORT_FEB_2026-1789723.pdf
- 26_00967_FULL-ARBORICULTURE-IMPACT_ASSESSMENT-1789724.pdf
- 26_00967_FULL-CATHEDRAL_MEASURE_BOUNDARY_PLANS_2012-1789725.pdf
- 26_00967_FULL-J100_NORTH_CHURCHYARD_ADBA_COMPRESSED_V1.0-1789726.pdf
- 26_00967_FULL-J100_NORTH_CHURCHYARD_AIA_V1.0_COMPRESSED-1789727.pdf
- 26_00967_FULL-12113-RP-004-02_LIGHTING_DESIGN_REPORT-1789728.pdf
- 26_00967_FULL-12113-RP-004A-00_LIGHTING_DESIGN_REPORT_APPENDIX-1789729.pdf
- 26_00967_FULL-12113-RP-007-01_LIGHTING_SUMMARY-1789730.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-0CF_CHURCH_FLOOR_LEVEL_1_OF_2-1789731.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_SP-0CF_CHURCH_FLOOR_LEVEL_2_OF_2-1789732.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_CARTER_LANE_GARDENS-1789733.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_1_CARTER_LANE-1789734.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-08_COLONNADE_PERISTYLE_LEVEL-1789735.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-0C_CRYPT_LEVEL-1789736.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_ST._PAUL_S_CATHEDRAL_CHURCHYARD_1_OF_3-1789737.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_ST._PAUL_S_CATHEDRAL_CHURCHYARD_2_OF_3-1789738.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_ST._PAUL_S_CATHEDRAL_CHURCHYARD_3_OF_3-1789739.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-10_STONE_GALLERY_ROOF_LEVEL-1789740.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-19_GOLDEN_GALLERY_LEVEL-1789741.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-20_LANTERN_AND_CUPOLA_LEVEL-1789742.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_JUXON_HOUSE-1789743.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_PATERNOSTER_HOUSE-1789744.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_1_PATERNOSTER_SQUARE-1789745.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_ST_AUGUSTINE_S_TOWER-1789746.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_ST._PAUL_S_CHOIR_SCHOOL-1789747.pdf
- 26_00967_FULL-PROPOSED_ELECTRICAL_SERVICES_LAYOUT_1-4_ST._PAUL_S_CHURCHYARD-1789748.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-02_TRIFORIUM_LEVEL_1_OF_2-1789749.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-02_TRIFORIUM_LEVEL_2_OF_2-1789750.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-05_UPPER_ROOF_LEVEL_1_OF_3-1789751.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-05_UPPER_ROOF_LEVEL_2_OF_3-1789752.pdf
- 26_00967_FULL-ELECTRICAL_SERVICES_LAYOUT_SP-05_UPPER_ROOF_LEVEL_3_OF_3-1789753.pdf
- 26_00967_FULL-ELECTRICAL_RIBA_STAGE_3_REPORT-1789754.pdf
- 26_00967_FULL-ELECTRICAL_RIBA_STAGE_3_REPORT-1789755.pdf
- 26_00967_FULL-APPENDIX_B_-_ANNOTATED_DRAWING_12113-LA-002-1789756.pdf
- 26_00967_FULL-LIGHTING_CONTROL_SYSTEM_SCHEMATIC__PRELIMINARY_-1789757.pdf
- 26_00967_FULL-APPENDIX_A_SCHEDULE_OF_ELEC_INFRASTRUCTURE_STRATEGY-1789758.pdf
- 26_00967_FULL-LIGHTING_CONTROL_SYSTEM_SPECIFICATION_AND_CONTROL_INTENT-1789961.pdf
- 26_00967_FULL-BUILDERS_WORK-1790002.pdf
- 26_00967_FULL-PLANNING_STATEMENT-1803404.pdf
- 26_00967_FULL-DESIGN___ACCESS_STATEMENT-1803408.pdf
- 26_00967_FULL-ARBORICULTURE_ASSESSMENT-1803415.pdf
- 26_00967_FULL-ECOLOGICAL_ASSESSMENT_OF_LIGHTING_IMPACT-1803420.pdf
- 26_00967_FULL-NOCTURNAL_BAT_SURVEY_REPORT-1803422.pdf
- 26_00967_FULL-LIGHTING_DESIGN_REPORT-1803426.pdf
- 26_00967_FULL-LIGHTING_DESIGN_REPORT_-_APPENDIX-1803427.pdf
- 26_00967_FULL-LIGHTING_DESIGN_SUMMARY___ADDENDUM-1803430.pdf
- 26_00967_FULL-DRAWING_ISSUE_SHEET-1813177.pdf
- 26_00967_FULL-SITE_LOCATION_PLAN-1813180.pdf
- 26_00967_FULL-SITE_LOCATION_PLAN-1813181.pdf
- 26_00967_FULL-APPLICATION_FORM_REDACTED-1815282.pdf
- 26_00967_FULL-COMMENTS_-_TRANSPORT_FOR_LONDON-1818450.pdf
Where it’s at
Comments have closed. A decision is due by 27 November.
- Received8 Jul 2026
- Validated2 Oct 2026The council has everything it needs.
- Comments closed23 Oct 2026Usual deadline. Late comments may still count.
- Target decision (next)27 Nov 20268-week target for minor and other applications.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- CITY-OF-LONDON/26/00967/FULL
- Address
- St Pauls Cathedral, 4 St Pauls Churchyard, Juxon House And Chapter House St Pauls Churchyard, 1 Paternoster Square, Paternoster House 65 St Pauls Churchyard, St Pauls Cathedral School, 2 New Change, 1 Carter Lane, Pvmnt O/s Carter Lane Gdns
- Status
- Under Consideration
- Category
- External Lighting & Fixtures
- Impact scale
- 5/10
- Authority
- City of London
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.