Skip to content

Planning application · CITY-OF-LONDON/26/01517/MDC

CITY-OF-LONDON/26/01517/MDCUnder consideration

Details for approved refurbishment at 60 Great Tower Street.

60 Great Tower Street London EC3R 5AZ

Billingsgate ward · City of London

Overview

Today
An approved refurbishment and alterations scheme
Proposed
Approval of details for conditions 2, 3, 5 and 10
Stage
Comments closed. Decision due by 21 Dec 2026.
Detailed design and rams for temporary works rev 1 full_part_4

In plain English

The City of London Corporation is being asked to approve details required by conditions of planning permission 26/00302/FULL, dated 04.06.2026. The approved scheme involves refurbishment and alterations, including new roof terraces, plant equipment and entrance works. This application covers a highway and surrounding areas survey, a construction logistics plan, temporary works details and a strategy for protecting nearby residents from noise, dust and other environmental effects.

Written with AI from the application form and the council record.

Keep reading

Track this application

How do I track planning application CITY-OF-LONDON/26/01517/MDC?

Follow it on City Scope. This page is checked against the City of London planning register and shows the latest status, decision and documents for CITY-OF-LONDON/26/01517/MDC. To comment on the application, use the City of London planning portal.