Planning applicationDGY/25/1050/LBC

130-132 High Street Dumfries DG1 2BG

DecidedWorth watchingChange of Use & Conversions
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

2 June 2025

Validated

4 June 2025

Planning Signals

7 detected traits

Works
Facade / ExteriorRoof WorksWindows & Doors
Context
Listed Building
Specific
BankExternal Alterations
AI summary

Former bank could become a retail unit and seven flats, with a replacement shopfront, rooflights, dormers, stonework, doors and window alterations.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/1050/LBC

130-132 High Street Dumfries DG1 2BG

DecidedChange of Use & ConversionsReceived Dumfries and Galloway Council

Former bank could become a retail unit and seven flats, with a replacement shopfront, rooflights, dormers, stonework, doors and window alterations.

Reference
DGY/25/1050/LBC
Address
130-132 High Street Dumfries DG1 2BG
Status
Decided
Category
Change of Use & Conversions
Impact scale
7/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.0689
Longitude
-3.6104

Plain-language summary

Former bank could become a retail unit and seven flats, with a replacement shopfront, rooflights, dormers, stonework, doors and window alterations.

As filed with the council

INTERNAL AND EXTERNAL ALTERATIONS TO BRING ABOUT CHANGE OF USE OF FORMER BANK (CLASS 1A) TO RETAIL UNIT (CLASS 1A) AND 7 FLATTED DWELLINGS (SUI GENERIS), INCLUDING INSTALLATION OF REPLACEMENT SHOPFRONT, RE-SLATING OF ROOF, INSTALLATION OF ROOFLIGHTS, RE-POINTING, REPLACEMENT AND CLEANING OF STONEWORK, INSTALLATION OF REPLACEMENT DOORS, ALTERATIONS TO WINDOW OPENINGS AND DORMER WINDOWS, RE-INSTATEMENT OF WINDOW OPENINGS AND ASSOCIATED WORKS