Planning applicationDGY/25/1149/S36

Proposed Appin Wind Farm West Of Monaive Thornhill Dumfries

Assessment StageWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

No documents shown on CityScope

Check the council portal for drawings and supporting documents.

Received

12 June 2025

Validated

12 June 2025

Planning Signals

9 detected traits

Specific
Access RoadsBorrow PitRail InfrastructureRailway InfrastructureRailway StationSection 36 Consent
AI summary

A proposed 9-turbine wind farm, with turbines up to 200m, access tracks, substation, control building, borrow pits and temporary compounds.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/1149/S36

Proposed Appin Wind Farm West Of Monaive Thornhill Dumfries

Assessment StageRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

A proposed 9-turbine wind farm, with turbines up to 200m, access tracks, substation, control building, borrow pits and temporary compounds.

Reference
DGY/25/1149/S36
Address
Proposed Appin Wind Farm West Of Monaive Thornhill Dumfries
Status
Assessment Stage
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created

Plain-language summary

A proposed 9-turbine wind farm, with turbines up to 200m, access tracks, substation, control building, borrow pits and temporary compounds.

As filed with the council

CONSULTATION FROM SCOTTISH MINISTERS REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR ERECTION OF A WIND FARM COMPRISING 9 WIND TURBINES (MAXIMUM TIP HEIGHT OF 200M), ACCESS TRACKS, WATERCOURSE CROSSINGS, CONTROL BUILDING AND SUBSTATION, 2 TEMPORARY CONSTRUCTION COMPOUNDS, 3 TEMPORARY BORROW PITS AND ASSOCIATED INFRASTRUCTURE