Planning application · DGY/25/1242/FUL
Flue for a biomass boiler at Distillery Farm.
Distillery Farm Adjacent To Annandale Distillery Annan DG12 5LL
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Mechanical Plant, Flues & Ventilation
- Small 3/10
- Biomass Energy
- Brewery Site
- Energy Centre
- External Flue Installation
- Retrospective
Overview
- Today
- Farm building; 6 vehicle parking spaces.
- Proposed
- Half of the farm building converted into an energy centre, with a flue for a biomass boiler; 6 vehicle parking spaces.
- Size
- 39 m² proposed floorspace · 38.74 m² site area
- Stage
- Decided on 13 Aug 2025: Grant Conditionally.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a flue to serve a biomass boiler at Distillery Farm, beside Annandale Distillery. The form says half of a farm building would be converted into an energy centre serving an existing domestic property. The application is retrospective, but the form says the work had not started or been completed when it was submitted.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/25/1242/FUL?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/25/1242/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A flue is proposed for the biomass boiler at Distillery Farm.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Biomass Energy
- Brewery Site
- Energy Centre
- External Flue Installation
- Retrospective
What each tag is based on
- Biomass Energy
- “installation of biomass boiler”
- Brewery Site
- “Annandale Distillery”
- Energy Centre
- “Annandale Distillery energy centre”
- External Flue Installation
- “installation of flue”
- Retrospective
- “retrospective”
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 13 August 2025.
- Received30 Jun 2025
- Validated4 Jul 2025The council has everything it needs.
- Comments closed25 Jul 2025Usual deadline. Late comments may still count.
- Target decision4 Sept 20252-month target for local developments.
- Decision13 Aug 2025Grant Conditionally.
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- DGY/25/1242/FUL
- Address
- Distillery Farm Adjacent To Annandale Distillery Annan DG12 5LL
- Status
- Decided
- Council decision
- Grant Conditionally
- Decision issued
- Category
- Mechanical Plant, Flues & Ventilation
- Impact scale
- 3/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Annandale South
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.






