Planning application · DGY/25/1252/S36
Eight wind turbines and a battery storage system proposed near Kirkcowan.
Shennanton Wind Farm Approximately 3.1km North-West Of Kirkcowan Newton Stewart
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Renewable Energy Infrastructure
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 8
Overview
Why it’s worth watching
A large-scale wind farm and battery storage proposal of regional significance with documented local representation.
- Proposed
- Eight wind turbines up to 200 metres to blade tip, and a battery energy storage system of approximately 30MW
- Size
- 8 turbines wind turbines
- Stage
- Past its target date of 27 Aug 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
Scottish Ministers have consulted Dumfries and Galloway Council on an application under Section 36 of the Electricity Act 1989. It seeks permission for a wind farm with eight turbines, each up to 200 metres to blade tip, and a battery energy storage system with capacity of approximately 30MW. The site is about 3.1km north-west of Kirkcowan.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/25/1252/S36?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/25/1252/S36. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal includes eight wind turbines up to 200 metres to blade tip.
- 02
A battery energy storage system is proposed, with capacity of approximately 30MW.
Tags
- Renewable Energy Infrastructure
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 8
What each tag is based on
- Renewable Energy Infrastructure
- “wind farm”, “battery energy storage system”
- Section 36 Consent
- “application made under section 36 of the electricity act 1989”
- Wind Turbine
- “erection of a wind farm”
- Wind Turbine Count 8
- “8no. wind turbines”
As lodged
The drawings.
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received27 Jun 2025
- Validated27 Jun 2025The council has everything it needs.
- Comments closed18 Jul 2025Usual deadline. Late comments may still count.
- Target decision (next)27 Aug 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- DGY/25/1252/S36
- Address
- Shennanton Wind Farm Approximately 3.1km North-West Of Kirkcowan Newton Stewart
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







