Planning application · DGY/25/1477/S36
Six wind turbines, up to 200 metres tall, proposed at Balgray.
Balgray Wind Farm 6KM North East Of Lockerbie
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Works
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
A Section 36 consultation for a six-turbine wind farm with battery storage and 200m tip heights is a substantial energy development near Lockerbie.
- Proposed
- A wind farm with six turbines, a battery energy storage system and associated works.
- Size
- 6 wind turbines · 200 metres maximum turbine tip height
- Stage
- Past its target date of 8 Oct 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
Scottish Ministers have asked for consultation on an application under section 36 of the Electricity Act 1989 to build a wind farm at Balgray, north east of Lockerbie. It would include six wind turbines, a battery energy storage system and associated works. The application is at assessment stage.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/25/1477/S36?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/25/1477/S36. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Six wind turbines are proposed, with a maximum tip height of 200 metres.
- 02
A battery energy storage system is proposed.
- 03
Associated works are proposed, but the description does not specify what they involve.
Tags
- Associated Works
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Associated Works
- “AND ASSOCIATED WORKS”
- Section 36 Consent
- “APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989”
- Wind Turbine
- “WINDFARM COMPRISING 6 WIND TURBINES”
As lodged
The drawings.
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received8 Aug 2025
- Validated8 Aug 2025The council has everything it needs.
- Comments closed29 Aug 2025Usual deadline. Late comments may still count.
- Target decision (next)8 Oct 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- DGY/25/1477/S36
- Address
- Balgray Wind Farm 6KM North East Of Lockerbie
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







