Planning applicationDGY/25/1492/FUL

Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)

Assessment StageWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

11 August 2025

Validated

20 August 2025

Planning Signals

3 detected traits

Works
Hardstanding
Specific
Access ChangesAssociated Infrastructure
Application Insights

No form insights available yet.

AI summary

Proposed single wind turbine (up to 76m blade tip) with hardstanding, related infrastructure and alterations to existing access at Meikle Float.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/1492/FUL

Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)

Assessment StageRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Proposed single wind turbine (up to 76m blade tip) with hardstanding, related infrastructure and alterations to existing access at Meikle Float.

Reference
DGY/25/1492/FUL
Address
Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
Status
Assessment Stage
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
54.8027
Longitude
-5.0186

Plain-language summary

Proposed single wind turbine (up to 76m blade tip) with hardstanding, related infrastructure and alterations to existing access at Meikle Float.

As filed with the council

ERECTION OF 1 NO. WIND TURBINE (76 METRES MAXIMUM HEIGHT TO BLADE TIP), HARDSTANDING, ASSOCIATED INFRASTRUCTURE AND ALTERATIONS TO EXISTING ACCESS