Planning applicationDGY/25/1502/S36

Proposed Lagrae Battery Energy Storage System Near Lagrae Kirkconnel

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

11 August 2025

Validated

11 August 2025

Planning Signals

1 detected trait

Specific
Section 36 Consent
AI summary

Battery energy storage and associated grid infrastructure proposed, with generation capacity up to 400MW and noise controls.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/1502/S36

Proposed Lagrae Battery Energy Storage System Near Lagrae Kirkconnel

DecidedRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Battery energy storage and associated grid infrastructure proposed, with generation capacity up to 400MW and noise controls.

Reference
DGY/25/1502/S36
Address
Proposed Lagrae Battery Energy Storage System Near Lagrae Kirkconnel
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created

Plain-language summary

Battery energy storage and associated grid infrastructure proposed, with generation capacity up to 400MW and noise controls.

As filed with the council

CONSULTATION FROM SCOTTISH MINISTERS REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR INSTALLATION OF A BATTERY ENERGY STORAGE SYSTEM AND ASSOCIATED INFRASTRUCTURE WITH A GENERATING CAPACITY OF UP TO 400MW