Planning application · DGY/25/1581/SCR
Screening opinion for a 102-metre wind turbine at Meikle Float Farm.
Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 6/10
- Eia Screening
- Wind Turbine
Overview
Why it’s worth watching
A 102-metre wind turbine with associated infrastructure and access alterations at a named farm is a substantial renewable energy proposal with clear local consequence.
- Proposed
- One wind turbine, hardstanding, associated infrastructure and alterations to the existing access
- Size
- 102 metres maximum height to blade tip · 1 wind turbines
- Stage
- Council responded on 4 Nov 2025: EIA Required.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a screening opinion under Scotland’s environmental impact assessment rules. It asks whether the proposal for one wind turbine, with a maximum height of 102 metres to the blade tip, needs an environmental impact assessment. The description also includes hardstanding, associated infrastructure and alterations to the existing access.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/25/1581/SCR?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/25/1581/SCR. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A wind turbine with a maximum height of 102 metres to the blade tip is proposed.
- 02
The proposal includes hardstanding and associated infrastructure.
- 03
Alterations to the existing access are proposed.
Questions
What does a screening opinion decide?
It considers whether the proposal needs an environmental impact assessment under the relevant Scottish regulations.
Does this application itself seek permission to build the turbine?
The description is for a screening opinion, not a planning application for permission to build.
Tags
- Eia Screening
- Wind Turbine
What each tag is based on
- Eia Screening
- “SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING ENVIRONMENTAL IMPACT ASSESSMENT”
- Wind Turbine
- “ERECTION OF 1 NO. WIND TURBINE”
Where it’s at
The council has responded on 4 November 2025.
- Received20 Aug 2025
- Validated20 Aug 2025The council has everything it needs.
- Comments closed10 Sept 2025Usual deadline. Late comments may still count.
- Target decision20 Oct 20252-month target for local developments.
- Decision4 Nov 2025EIA Required.
The record
- Reference
- DGY/25/1581/SCR
- Address
- Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
- Status
- Decided
- Council decision
- EIA Required
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







