Planning applicationDGY/25/1883/FUL

Auchengibbert Farm Crocketford Dumfries DG2 8RQ

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

13 October 2025

Validated

3 November 2025

Planning Signals

3 detected traits

Use
Agricultural Building
Works
Flues & Ventilation
Specific
Biomass Energy
Application Insights

No form insights available yet.

AI summary

110kW biomass boiler proposed inside an existing farm building, with associated flue/plant works.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/1883/FUL

Auchengibbert Farm Crocketford Dumfries DG2 8RQ

DecidedRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

110kW biomass boiler proposed inside an existing farm building, with associated flue/plant works.

Reference
DGY/25/1883/FUL
Address
Auchengibbert Farm Crocketford Dumfries DG2 8RQ
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
4/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.0247
Longitude
-3.8303

Plain-language summary

110kW biomass boiler proposed inside an existing farm building, with associated flue/plant works.

As filed with the council

INSTALLATION OF 110KW BIOMASS BOILER WITHIN EXISTING BUILDING