Planning applicationDGY/25/1928/UTL

Existing Base Station Southwest Sheds Dinwoody Timeryard Johnstonbridge

DecidedMechanical Plant, Flues & Ventilation
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

17 October 2025

Validated

17 October 2025

Planning Signals

2 detected traits

Context
Telecomms
Specific
Generator
AI summary

Plans to install a single backup generator and ancillary equipment at an existing EE base station to boost emergency power resilience.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/1928/UTL

Existing Base Station Southwest Sheds Dinwoody Timeryard Johnstonbridge

DecidedMechanical Plant, Flues & VentilationReceived Dumfries and Galloway Council

Plans to install a single backup generator and ancillary equipment at an existing EE base station to boost emergency power resilience.

Reference
DGY/25/1928/UTL
Address
Existing Base Station Southwest Sheds Dinwoody Timeryard Johnstonbridge
Status
Decided
Category
Mechanical Plant, Flues & Ventilation
Impact scale
3/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.1954
Longitude
-3.4088

Plain-language summary

Plans to install a single backup generator and ancillary equipment at an existing EE base station to boost emergency power resilience.

As filed with the council

INSTALLATION OF 1 GENERATOR AND ANCILLARY WORKS