Planning application · DGY/25/2076/SCR
Replacement wind turbine up to 43.5 metres proposed at Rerrick Park.
Rerrick Park Dundrennan Kirkcudbright DG6 4QT
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Eia Screening
- Grp Units
- Wind Turbine
Overview
Why it’s worth watching
Replacing an existing turbine with a 43.5-metre turbine and substation at a named rural location is a material energy infrastructure change warranting local awareness.
- Today
- An existing wind turbine is on the site.
- Proposed
- Replace it with a wind turbine up to 43.5 metres to blade tip and install a GRP substation.
- Size
- 43.5 metres maximum height to blade tip
- Stage
- Council responded on 12 Jan 2026: EIA Not Required.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application asks for a screening opinion on replacing an existing wind turbine at Rerrick Park with a turbine whose blade tip would reach a maximum height of 43.5 metres, and installing a GRP substation. GRP means glass-reinforced plastic. A screening opinion considers whether a project needs an environmental impact assessment; this application is not itself a request for planning permission for the works.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/25/2076/SCR?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/25/2076/SCR. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
An existing wind turbine would be replaced by a turbine with a maximum blade-tip height of 43.5 metres.
- 02
A GRP substation would be installed; its location is not stated.
Questions
What is the application asking the council to decide?
It asks for a screening opinion under the environmental impact assessment regulations. The case gives no screening outcome.
Is another application mentioned?
The submitted document list includes a location plan for application 25/1949/FUL.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Eia Screening
- Grp Units
- Wind Turbine
What each tag is based on
- Eia Screening
- “REQUEST FOR SCREENING OPINION”
- Grp Units
- “INSTALLATION OF A GRP SUBSTATION”
- Wind Turbine
- “ERECTION OF WIND TURBINE”
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 12 January 2026.
- Received3 Nov 2025
- Validated3 Nov 2025The council has everything it needs.
- Comments closed24 Nov 2025Usual deadline. Late comments may still count.
- Target decision3 Jan 20262-month target for local developments.
- Decision12 Jan 2026EIA Not Required.
The record
- Reference
- DGY/25/2076/SCR
- Address
- Rerrick Park Dundrennan Kirkcudbright DG6 4QT
- Status
- Decided
- Council decision
- EIA Not Required
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Dee and Glenkens
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.