CityScope · Planning Updates
Application DGY/25/2076/SCR
Rerrick Park Dundrennan Kirkcudbright DG6 4QT
EIA screening for replacing an existing wind turbine with an up-to 43.5m blade-tip turbine and a GRP substation.
The record
- Reference
- DGY/25/2076/SCR
- Address
- Rerrick Park Dundrennan Kirkcudbright DG6 4QT
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Dumfries and Galloway Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 54.799206
- Longitude
- -3.932054
What is proposed
Plain-language summary
EIA screening for replacing an existing wind turbine with an up-to 43.5m blade-tip turbine and a GRP substation.
As filed with the council
REQUEST FOR SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING ENVIRONMENTAL IMPACT ASSESSMENT (SCOTLAND) REGULATIONS 2017 FOR ERECTION OF WIND TURBINE (MAXIMUM HEIGHT TO BLADE TIP 43.5 METRES) AND INSTALLATION OF A GRP SUBSTATION (REPLACEMENT OF EXISITNG WIND TURBINE)