Planning application · DGY/25/2122/FUL
Six wind turbines up to 250m, plus control buildings, substation, access/roads, hardstanding and cable works at Glennomkloch Hill at Glenmuckloch Hill.
Glenmuckloch Hill Wind Farm Land At Former Glenmuckloch Surface Coal Mine North Of Kirkconnel
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Borrow Pit
- Temporary Construction Compound
- Wind Turbine
Overview
Why it’s worth watching
Major renewable energy development at a former surface coal mine with substantial scale, infrastructure and landscape evidence.
- Type
- Full planning permission
- Stage
- Past its target date of 21 Jan 2026.
The council writes only to properties within 20 metres of an application site. Who is told
As lodged with the council
ERECTION OF SIX WIND TURBINES (UP TO A MAXIMUM TIP HEIGHT OF 250 METRES), ERECTION OF CONTROL BUILDINGS, SUBSTATION AND WELFARE FACILITIES, FORMATION OF VEHICULAR ACCESS ONTO A76(T), INTERNAL ROADS AND ASSOCIATED WATERCOURSE CROSSINGS AND HARDSTANDING, EXCAVATION OF BORROW PITS AND EXCAVATION OF LAND FOR THE LAYING OF CABLES, FORMATION OF A TEMPORARY CONSTRUCTION COMPOUND AND ASSOCIATED WORKS
The headline is a plain-English summary written with AI from the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/25/2122/FUL?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/25/2122/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Dumfries and Galloway Council planning portal.
The impact
What the application says.
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Borrow Pit
- Temporary Construction Compound
- Wind Turbine
What each tag is based on
- Borrow Pit
- “EXCAVATION OF BORROW PITS”
- Temporary Construction Compound
- “FORMATION OF A TEMPORARY CONSTRUCTION COMPOUND”
- Wind Turbine
- “ERECTION OF SIX WIND TURBINES”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received18 Nov 2025
- Validated21 Nov 2025The council has everything it needs.
- Comments closed12 Dec 2025Usual deadline. Late comments may still count.
- Target decision (next)21 Jan 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- DGY/25/2122/FUL
- Address
- Glenmuckloch Hill Wind Farm Land At Former Glenmuckloch Surface Coal Mine North Of Kirkconnel
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







