Planning applicationDGY/25/2165/LBC

Tongland Power Station Tongland Kirkcudbright DG6 4LT

DecidedMechanical Plant, Flues & Ventilation
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

26 November 2025

Validated

26 November 2025

Planning Signals

3 detected traits

Context
Listed Building
Specific
Hydroelectric Power StationMechanical Plant
Application Insights

No form insights available yet.

AI summary

Proposed replacement turbine governors for each generator, removing existing actuators and related pipework, drive shafts and oil/air equipment within the turbine hall.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/2165/LBC

Tongland Power Station Tongland Kirkcudbright DG6 4LT

DecidedMechanical Plant, Flues & VentilationReceived Dumfries and Galloway Council

Proposed replacement turbine governors for each generator, removing existing actuators and related pipework, drive shafts and oil/air equipment within the turbine hall.

Reference
DGY/25/2165/LBC
Address
Tongland Power Station Tongland Kirkcudbright DG6 4LT
Status
Decided
Category
Mechanical Plant, Flues & Ventilation
Impact scale
4/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
54.8598
Longitude
-4.0347

Plain-language summary

Proposed replacement turbine governors for each generator, removing existing actuators and related pipework, drive shafts and oil/air equipment within the turbine hall.

As filed with the council

INSTALLATION OF REPLACEMENT TURBINE GOVERNOR TO EACH GENERATOR AND ASSOCIATED WORKS (REMOVAL OF EXISTING ACTUATOR, PIPEWORK, DRIVE SHAFT, AIR/OIL RECEIVER AND PUMP)