Planning applicationDGY/25/2303/FUL

Larg Farm Kirk Brae Creetown DG8 7DG

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

19 December 2025

Validated

6 January 2026

Planning Signals

1 detected trait

Specific
Wind Turbine
Application Insights

No form insights available yet.

AI summary

Alterations to an existing wind turbine with a new turbine head, boosting blade tip height to 49.1m and related works.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/2303/FUL

Larg Farm Kirk Brae Creetown DG8 7DG

DecidedRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Alterations to an existing wind turbine with a new turbine head, boosting blade tip height to 49.1m and related works.

Reference
DGY/25/2303/FUL
Address
Larg Farm Kirk Brae Creetown DG8 7DG
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
5/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
54.8949
Longitude
-4.3699

Plain-language summary

Alterations to an existing wind turbine with a new turbine head, boosting blade tip height to 49.1m and related works.

As filed with the council

ALTERATIONS TO EXISTING WIND TURBINE COMPRISING INSTALLATION OF NEW TURBINE HEAD (INCREASING BLADE TIP HEIGHT TO 49.1 METRES) AND ASSOCIATED WORKS