Wind turbine head replacement at Larg Farm would raise tip height to 49.1 metres.
Larg Farm Kirk Brae Creetown DG8 7DG
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Wind Turbine
Overview
Why it’s worth watching
Alterations to an existing wind turbine would install a new turbine head increasing blade tip height to 49.1 metres, with photomontages from Creetown and nearby routes.
- Today
- Agricultural use, including an existing wind turbine.
- Proposed
- A replacement turbine head, with blade tip height of 49.1 metres; existing tower, auxiliary buildings and access track reused.
- Size
- 49.1 metres proposed blade tip height · 35 years permission period sought · 26,438 m² site area
- Stage
- Decided on 25 Jun 2026: Grant Conditionally.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes replacing the head of the existing wind turbine at Larg Farm, increasing its blade tip height to 49.1 metres. The existing tower, auxiliary buildings and access track would be reused. The form says the permission sought is temporary and gives a period of 35 years.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/25/2303/FUL?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/25/2303/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The turbine head would be replaced, increasing the blade tip height to 49.1 metres.
Questions
What would stay in place?
The form says the existing tower, auxiliary buildings and access track would be reused.
How long is permission being sought for?
The form gives a temporary permission period of 35 years.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Wind Turbine
What each tag is based on
- Wind Turbine
- “ALTERATIONS TO EXISTING WIND TURBINE”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 25 June 2026.
- Received19 Dec 2025
- Validated6 Jan 2026The council has everything it needs.
- Comments closed27 Jan 2026Usual deadline. Late comments may still count.
- Target decision6 May 20264-month target for major developments.
- Decision25 Jun 2026Grant Conditionally.
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- DGY/25/2303/FUL
- Address
- Larg Farm Kirk Brae Creetown DG8 7DG
- Status
- Decided
- Council decision
- Grant Conditionally
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Mid Galloway and Wigtown West
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.