Planning applicationDGY/26/0028/S42

Troston Loch Wind Farm Site Approximately 7km West Of Moniaive

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

9 January 2026

Validated

13 January 2026

Planning Signals

10 detected traits

Specific
Associated InfrastructureBorrow PitMet MastRail InfrastructureRailway InfrastructureRailway Station
Application Insights

No form insights available yet.

AI summary

Proposed wind farm with up to 14 turbines (blade tip height to 149.9m), plus tracks, substation and construction compounds; seeks an 8-year implementation extension.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/26/0028/S42

Troston Loch Wind Farm Site Approximately 7km West Of Moniaive

DecidedRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Proposed wind farm with up to 14 turbines (blade tip height to 149.9m), plus tracks, substation and construction compounds; seeks an 8-year implementation extension.

Reference
DGY/26/0028/S42
Address
Troston Loch Wind Farm Site Approximately 7km West Of Moniaive
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.1832
Longitude
-4.0641

Plain-language summary

Proposed wind farm with up to 14 turbines (blade tip height to 149.9m), plus tracks, substation and construction compounds; seeks an 8-year implementation extension.

As filed with the council

ERECTION OF 14 WIND TURBINES (MAXIMUM HEIGHT 149.9M TO BLADE TIP) (ELECTRICITY CAPACITY 50MW), ACCESS TRACKS, TEMPORARY CONSTRUCTION COMPOUND, BORROW PITS, ANEMOMETRY MAST, SUBSTATION BUILDING, FORMATION OF ACCESS AND ASSOCIATED WORKS (AT VARIANCE WITH CONDITION 7 OF DEEMED PLANNING PERMISSION ECU00001785 SEEKING TO ALLOW A STATED PERIOD OF 8 YEARS FOR THE IMPLEMENTATION OF THE PROPOSED DEVELOPMENT WITHIN THE DEEMED PLANNING PERMISSION)