Application DGY/26/0028/S42
Troston Loch Wind Farm Site Approximately 7km West Of Moniaive
Proposed wind farm with up to 14 turbines (blade tip height to 149.9m), plus tracks, substation and construction compounds; seeks an 8-year implementation extension.
The record
- Reference
- DGY/26/0028/S42
- Address
- Troston Loch Wind Farm Site Approximately 7km West Of Moniaive
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Dumfries and Galloway Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.1832
- Longitude
- -4.0641
What is proposed
Plain-language summary
Proposed wind farm with up to 14 turbines (blade tip height to 149.9m), plus tracks, substation and construction compounds; seeks an 8-year implementation extension.
As filed with the council
ERECTION OF 14 WIND TURBINES (MAXIMUM HEIGHT 149.9M TO BLADE TIP) (ELECTRICITY CAPACITY 50MW), ACCESS TRACKS, TEMPORARY CONSTRUCTION COMPOUND, BORROW PITS, ANEMOMETRY MAST, SUBSTATION BUILDING, FORMATION OF ACCESS AND ASSOCIATED WORKS (AT VARIANCE WITH CONDITION 7 OF DEEMED PLANNING PERMISSION ECU00001785 SEEKING TO ALLOW A STATED PERIOD OF 8 YEARS FOR THE IMPLEMENTATION OF THE PROPOSED DEVELOPMENT WITHIN THE DEEMED PLANNING PERMISSION)