Planning application · DGY/26/0028/S42
Changes to the approved 14-turbine wind farm scheme near Moniaive.
Troston Loch Wind Farm Site Approximately 7km West Of Moniaive
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Borrow Pit
- Met Mast
- Rail Infrastructure
- Railway Infrastructure
Overview
- Today
- The site is described as a forestry plantation. The wind farm has an existing deemed planning permission.
- Proposed
- Change condition 7 to allow an 8-year period to implement the approved scheme.
- Size
- 14 approved turbines · 149.9 m maximum height to blade tip · 50 MW electricity capacity
- Stage
- Decided on 17 Apr 2026: Grant Conditionally.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application seeks to vary condition 7 of the existing deemed planning permission, meaning it would change one condition attached to the approved scheme. It seeks an 8-year period for implementing the development. The earlier permission is ECU00001785, granted on 18/12/2020. The application record says it is decided but does not give the decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/0028/S42?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/0028/S42. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The approved scheme includes wind turbines with a maximum height of 149.9m to blade tip.
- 02
The description also lists access tracks, a temporary construction compound, borrow pits, an anemometry mast, a substation building and associated works. This application seeks to change the implementation period, not to approve a different set of physical works.
Questions
What does this application change?
It seeks to vary condition 7 of the deemed planning permission, allowing an 8-year period to implement the scheme.
What happens after the scheme starts generating electricity?
The form says the development must cease generating electricity no later than 30 years from the date of final commissioning.
What earlier permission is this linked to?
It relates to permission ECU00001785, granted on 18/12/2020.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Borrow Pit
- Met Mast
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Section 42 Variation
- Substation
- Temporary Construction Compound
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “ACCESS TRACKS, TEMPORARY CONSTRUCTION COMPOUND, BORROW PITS, ANEMOMETRY MAST, SUBSTATION BUILDING”
- Borrow Pit
- “BORROW PITS”
- Met Mast
- “ANEMOMETRY MAST”
- Rail Infrastructure
- “Troston Loch Wind Farm Site Approximately 7km West Of Moniaive”
- Railway Infrastructure
- “Troston Loch Wind Farm Site Approximately 7km West Of Moniaive”
- Railway Station
- “Troston Loch Wind Farm Site Approximately 7km West Of Moniaive”
- Section 42 Variation
- “AT VARIANCE WITH CONDITION 7 OF DEEMED PLANNING PERMISSION”, “8 YEARS FOR THE IMPLEMENTATION”
- Substation
- “SUBSTATION BUILDING”
- Temporary Construction Compound
- “TEMPORARY CONSTRUCTION COMPOUND”
- Wind Turbine
- “ERECTION OF 14 WIND TURBINES”, “MAXIMUM HEIGHT 149.9M TO BLADE TIP”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 17 April 2026.
- Received9 Jan 2026
- Validated13 Jan 2026The council has everything it needs.
- Comments closed3 Feb 2026Usual deadline. Late comments may still count.
- Target decision13 May 20264-month target for major developments.
- Decision17 Apr 2026Grant Conditionally.
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- DGY/26/0028/S42
- Address
- Troston Loch Wind Farm Site Approximately 7km West Of Moniaive
- Status
- Decided
- Council decision
- Grant Conditionally
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.