Planning application · DGY/26/0133/S36
Up to 23 wind turbines proposed at Hare Hill.
Hare Hill Wind Farm Repowering and Extension Located Approximately 1.5 Km South East Of The Village Of New Cumnock and 4.5 Km West Of Kirkconnel
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
A 23-turbine wind farm repowering and extension under Section 36 is a large-scale energy development with clear public consequence.
- Proposed
- Up to 23 wind turbines and associated ancillary infrastructure
- Size
- 200 m maximum turbine tip height · 4.5 km west distance from Kirkconnel
- Stage
- Past its target date of 27 Mar 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
Dumfries and Galloway Council has received a consultation from Scottish Ministers about an application under section 36 of the Electricity Act 1989. The proposal is to repower and extend Hare Hill Wind Farm with up to 23 wind turbines and associated infrastructure. The site is described as approximately 1.5 km south east of New Cumnock and 4.5 km west of Kirkconnel.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/0133/S36?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/0133/S36. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal includes up to 23 wind turbines, with a maximum tip height of 200m.
- 02
Associated ancillary infrastructure is also proposed; the record does not specify what it includes.
Questions
Who is considering the application?
The application was made to Scottish Ministers. Dumfries and Galloway Council has received a consultation about it.
What happens next?
The application is at the assessment stage.
Tags
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “AND ASSOCIATED ANCILLARY INFRASTRUCTURE”
- Rail Infrastructure
- “Hare Hill Wind Farm Repowering And Extension Located Approximately 1.5 Km South East Of The Village Of New Cumnock And 4.5 Km West Of Kirkconnel”
- Railway Infrastructure
- “Hare Hill Wind Farm Repowering And Extension Located Approximately 1.5 Km South East Of The Village Of New Cumnock And 4.5 Km West Of Kirkconnel”
- Section 36 Consent
- “MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989”
- Wind Turbine
- “PROPOSED WIND FARM COMPRISING OF UP 23 WIND TURBINES”
As lodged
The drawings.
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received27 Jan 2026
- Validated27 Jan 2026The council has everything it needs.
- Comments closed17 Feb 2026Usual deadline. Late comments may still count.
- Target decision (next)27 Mar 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- DGY/26/0133/S36
- Address
- Hare Hill Wind Farm Repowering And Extension Located Approximately 1.5 Km South East Of The Village Of New Cumnock And 4.5 Km West Of Kirkconnel
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







