Planning applicationDGY/26/0684/CSG

Proposed Shepherds Rig Wind Farm Site Near Carsphairn

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

23 April 2026

Validated

23 April 2026

Planning Signals

3 detected traits

Specific
Associated InfrastructureEia ScopingWind Turbine Count 13 Or Up To 13
AI summary

Scoping for Shephards Rig windfarm: up to 13 turbines (200m to blade tip) plus battery energy storage and associated infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/26/0684/CSG

Proposed Shepherds Rig Wind Farm Site Near Carsphairn

DecidedRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Scoping for Shephards Rig windfarm: up to 13 turbines (200m to blade tip) plus battery energy storage and associated infrastructure.

Reference
DGY/26/0684/CSG
Address
Proposed Shepherds Rig Wind Farm Site Near Carsphairn
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created

Plain-language summary

Scoping for Shephards Rig windfarm: up to 13 turbines (200m to blade tip) plus battery energy storage and associated infrastructure.

As filed with the council

CONSULTATION REQUEST FROM SCOTTISH GOVERNMENT IN RELATION TO SCOPING OPINION UNDER THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) (SCOTLAND) REGULATIONS 2017 FOR A PROPOSED WINDFARM UP TO 13 WIND TURBINES (MAXIMUM HEIGHT 200 METRES TO BLADE TIP) WITH ASSOCIATED INFRASTRUCTURE INCLUDING A BATTERY ENERGY STORAGE SYSTEM (TOTAL GENERATING CAPACITY WILL BE IN EXCESS OF 50MW)