Planning applicationDGY/26/0843/S36

Proposed High Mark Wind Farm Site Approximately 5km To The North East Of Cairnryan Stranraer

Assessment StageWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

15 May 2026

Validated

15 May 2026

Planning Signals

3 detected traits

Specific
Associated InfrastructureSection 36 ConsentWind Turbine
AI summary

Consultation on a wind farm with 7 turbines up to 200m tip height, plus battery energy storage and related infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/26/0843/S36

Proposed High Mark Wind Farm Site Approximately 5km To The North East Of Cairnryan Stranraer

Assessment StageRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Consultation on a wind farm with 7 turbines up to 200m tip height, plus battery energy storage and related infrastructure.

Reference
DGY/26/0843/S36
Address
Proposed High Mark Wind Farm Site Approximately 5km To The North East Of Cairnryan Stranraer
Status
Assessment Stage
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created

Plain-language summary

Consultation on a wind farm with 7 turbines up to 200m tip height, plus battery energy storage and related infrastructure.

As filed with the council

CONSULTATION FROM SCOTTISH GOVERNMENT REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR A WIND FARM COMPRISING THE ERECTION OF 7 WIND TURBINES (MAXIMUM HEIGHT TO BLADE TIP 200 METRES), INSTALLATION OF BATTERY ENERGY STORAGE SYSTEM AND ASSOCIATED INFRASTRUCTURE FOR AN OPERATIONAL PERIOD OF 40 YEARS