Planning application · DGY/26/0857/SCR
Screening decision for a 76-metre wind turbine at Meikle Float Farm.
Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Eia Screening
- Wind Turbine
Overview
Why it’s worth watching
A 76-metre wind turbine proposal is a substantial infrastructure change with potential landscape and access effects.
- Proposed
- One wind turbine, up to 76 metres high to the blade tip, with hardstanding, associated infrastructure and alterations to the existing access.
- Size
- 76 metres maximum height to blade tip · 1 turbines
- Stage
- Council responded on 17 Jul 2026: EIA Not Required.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought a screening opinion: a decision on whether an Environmental Impact Assessment (EIA) is required for the proposed wind turbine and associated works. The council decided that an EIA is not required. A submitted location plan is labelled 25/1492/FUL.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/0857/SCR?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/0857/SCR. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A wind turbine up to 76 metres high to the blade tip is proposed.
- 02
Hardstanding and associated infrastructure are proposed.
- 03
Alterations to the existing access are proposed.
Questions
What did the council decide?
It decided that an Environmental Impact Assessment is not required.
Does this application decide whether the turbine can be built?
This is a screening opinion about whether an Environmental Impact Assessment is required; the record gives no decision on permission to build the turbine.
What is 25/1492/FUL?
A submitted location plan is labelled with that reference.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Eia Screening
- Wind Turbine
What each tag is based on
- Eia Screening
- “SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING ENVIRONMENTAL IMPACT ASSESSMENT (SCOTLAND) REGULATIONS 2017”
- Wind Turbine
- “ERECTION OF 1 NO. WIND TURBINE”
As lodged
The drawings.
Where it’s at
The council has responded on 17 July 2026.
- Received13 May 2026
- Validated13 May 2026The council has everything it needs.
- Comments closed3 Jun 2026Usual deadline. Late comments may still count.
- Target decision13 Jul 20262-month target for local developments.
- Decision17 Jul 2026EIA Not Required.
The record
- Reference
- DGY/26/0857/SCR
- Address
- Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
- Status
- Decided
- Council decision
- EIA Not Required
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







