Planning applicationDGY/26/0918/LBC

Comlongon Castle Clarencefield Dumfries DG1 4NA

Assessment StageWorth watchingInternal Works & Accessibility
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

26 May 2026

Validated

27 May 2026

Planning Signals

5 detected traits

Context
Listed Building
Specific
External StairGabion StructureSecurity ShutterStructural Works
Application Insights

No form insights available yet.

AI summary

Security grilles, internal wall linings removed with propping/stabilisation, plus a temporary staircase and barmkin wall excavation with a retaining gabion.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/26/0918/LBC

Comlongon Castle Clarencefield Dumfries DG1 4NA

Assessment StageInternal Works & AccessibilityReceived Dumfries and Galloway Council

Security grilles, internal wall linings removed with propping/stabilisation, plus a temporary staircase and barmkin wall excavation with a retaining gabion.

Reference
DGY/26/0918/LBC
Address
Comlongon Castle Clarencefield Dumfries DG1 4NA
Status
Assessment Stage
Category
Internal Works & Accessibility
Impact scale
6/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.0064
Longitude
-3.4409

Plain-language summary

Security grilles, internal wall linings removed with propping/stabilisation, plus a temporary staircase and barmkin wall excavation with a retaining gabion.

As filed with the council

INTERNAL AND EXTERNAL WORKS INCLUDING INSTALLATION OF SECURITY GRILLES, REMOVAL OF AREAS OF INTERNAL WALL LINING, STABILISATION AND, PROPPING WORKS, INSTALLATION OF TIMBER STRUCTURE AND TEMPORARY STAIRCASE, EXCAVATION OF BARMKIN WALL AND INSTALLATION OF TEMPORARY RETAINING GABION WALL (LATE)