CityScope · Planning Updates
Application DGY/26/1015/FUL
Elrig Farm Newton Stewart DG8 9RB
Erect up to two wind turbines (blade tip height ~28m) with GRP equipment units, temporary crane pads, access track and related works.
The record
- Reference
- DGY/26/1015/FUL
- Address
- Elrig Farm Newton Stewart DG8 9RB
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Dumfries and Galloway Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 54.8001
- Longitude
- -4.605
What is proposed
Plain-language summary
Erect up to two wind turbines (blade tip height ~28m) with GRP equipment units, temporary crane pads, access track and related works.
As filed with the council
ERECTION OF TWO WIND TURBINES (27.95 METRES TO BLADE TIP) AND INSTALLATION OF ASSOCIATED GRP UNITS, FORMATION OF TEMPORARY CRANE PADS AND ACCESS TRACK AND ASSOCIATED WORKS
