Planning application · DGY/26/1065/SCR
Repowering of three wind turbines at Dalvadie Farm under review.
Dalvadie Farm Stoneykirk Stranraer DG9 9DZ
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Access Roads
- Associated Infrastructure
- Associated Works
- Eia Scoping
- Eia Screening
Overview
- Today
- Agricultural use, with three operational Proven 15kW wind turbines.
- Proposed
- Replace the turbines with three BestWatt BW45 turbines and install associated GRP units, temporary crane pads and localised access track extensions.
- Size
- 3 turbines · 27.95 metres tip height · 4.63 ha site area
- Stage
- Past its target date of 9 Oct 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks a screening opinion: the council is being asked to decide whether the proposed repowering needs an environmental impact assessment, which is a detailed study of environmental effects. It describes replacing three existing turbines with three BestWatt BW45 turbines, each 27.95 metres to blade tip, with associated works. The form says there would be no change of use and the work has not started. A submitted location plan is titled for 26/1005/FUL.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/1065/SCR?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/1065/SCR. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Three wind turbines, each 27.95 metres to blade tip, are proposed to replace the existing turbines.
- 02
The works include new GRP units, temporary crane pads and localised extensions to existing access tracks.
Questions
What is the council being asked to decide?
Whether the proposal needs an environmental impact assessment. This application is for a screening opinion, not a decision on planning permission.
Is there a related application?
The submitted location plan is titled for application 26/1005/FUL.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- House Extension
- Telecomms
- Access Roads
- Associated Infrastructure
- Associated Works
- Eia Scoping
- Eia Screening
- Grp Units
- Rail Infrastructure
- Railway Infrastructure
- Renewable Energy Infrastructure
- Temporary Construction Compound
- Temporary Crane Pads
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Access Roads
- “EXTENSION TO EXISTING ACCESS TRACKS”
- Associated Infrastructure
- “EXTENSION TO EXISTING ACCESS TRACKS AND ASSOCIATED WORKS”
- Associated Works
- “AND ASSOCIATED WORKS”
- Eia Scoping
- “SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) (SCOTLAND) REGULATIONS 2017”
- Eia Screening
- “SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) (SCOTLAND) REGULATIONS 2017”
- Grp Units
- ““AND ASSOCIATED GRP UNITS””
- House Extension
- “extension”
- Rail Infrastructure
- “Dalvadie Farm Stoneykirk Stranraer DG9 9DZ”
- Railway Infrastructure
- “Dalvadie Farm Stoneykirk Stranraer DG9 9DZ”
- Renewable Energy Infrastructure
- “ERECTION OF 3 WIND TURBINES”
- Telecomms
- “associated GRP UNITS”
- Temporary Construction Compound
- “FORMATION OF TEMPORARY CRANE PADS”
- Temporary Crane Pads
- ““FORMATION OF TEMPORARY CRANE PADS””
- Wind Turbine
- “ERECTION OF 3 WIND TURBINES (27.95 METRES TO BLADE TIP)”
- Wind Turbine Count 13 Or Up To 13
- “ERECTION OF 3 WIND TURBINES (27.95 METRES TO BLADE TIP)”
All documents (2)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received9 Jun 2026
- Validated9 Jun 2026The council has everything it needs.
- Comments closed30 Jun 2026Usual deadline. Late comments may still count.
- Target decision (next)9 Oct 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Change of use
- Permission to use a building for a different purpose, for example offices to a hotel.
The record
- Reference
- DGY/26/1065/SCR
- Address
- Dalvadie Farm Stoneykirk Stranraer DG9 9DZ
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Stranraer and the Rhins
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.



