Planning applicationDGY/26/1231/S36

Proposed Ravengill Energy Park Wind Farm, Approximately 1km North Of Leadhills And 1.5km South Of Abington, South Lanarkshire

Assessment StageWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

No documents shown on CityScope

Check the council portal for drawings and supporting documents.

Received

15 July 2026

Validated

15 July 2026

Planning Signals

5 detected traits

Specific
Associated InfrastructureRenewable Energy InfrastructureSection 36 ConsentWind TurbineWind Turbine Count 13 Or Up To 13
AI summary

Erection of up to 21 wind turbines (up to 220m tip height) with a ~50MW battery storage system and associated infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/26/1231/S36

Proposed Ravengill Energy Park Wind Farm, Approximately 1km North Of Leadhills And 1.5km South Of Abington, South Lanarkshire

Assessment StageRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Erection of up to 21 wind turbines (up to 220m tip height) with a ~50MW battery storage system and associated infrastructure.

Reference
DGY/26/1231/S36
Address
Proposed Ravengill Energy Park Wind Farm, Approximately 1km North Of Leadhills And 1.5km South Of Abington, South Lanarkshire
Status
Assessment Stage
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created

Plain-language summary

Erection of up to 21 wind turbines (up to 220m tip height) with a ~50MW battery storage system and associated infrastructure.

As filed with the council

CONSULTATION FROM SCOTTISH GOVERNMENT REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR ERECTION OF 21 WIND TURBINES WITH A MAXIMUM TIP HEIGHT UP TO 220 METRES AND INCLUDE A BATTERY ENERGY STORAGE SYSTEM (BESS APPROX 50MW) AND ASSOCIATED INFRASTRUCTURE