CityScope · Planning Updates
Application DGY/26/1231/S36
Proposed Ravengill Energy Park Wind Farm, Approximately 1km North Of Leadhills And 1.5km South Of Abington, South Lanarkshire
Erection of up to 21 wind turbines (up to 220m tip height) with a ~50MW battery storage system and associated infrastructure.
The record
- Reference
- DGY/26/1231/S36
- Address
- Proposed Ravengill Energy Park Wind Farm, Approximately 1km North Of Leadhills And 1.5km South Of Abington, South Lanarkshire
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Dumfries and Galloway Council
Timeline
- Received
- Validated
- Last scraped
- Record created
What is proposed
Plain-language summary
Erection of up to 21 wind turbines (up to 220m tip height) with a ~50MW battery storage system and associated infrastructure.
As filed with the council
CONSULTATION FROM SCOTTISH GOVERNMENT REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR ERECTION OF 21 WIND TURBINES WITH A MAXIMUM TIP HEIGHT UP TO 220 METRES AND INCLUDE A BATTERY ENERGY STORAGE SYSTEM (BESS APPROX 50MW) AND ASSOCIATED INFRASTRUCTURE