Planning application · DGY/26/1968/S42
Changes to approved nine-turbine Fell Wind Farm scheme.
Fell Wind Farm Site Between Blackcraig Wind Farm and Loch Urr 7km To The South Of Moniaive
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Access Roads
- Borrow Pit
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
Overview
Why it’s worth watching
Material changes to a consented nine-turbine wind farm, including taller turbines and extended initiation period, are a significant renewable-energy and landscape decision.
- Today
- The form describes the current use as agriculture and forestry.
- Proposed
- Changes to the approved scheme, including changes to ancillary infrastructure and turbine siting and size; a further 5 years to start the development.
- Size
- 130 m micrositing allowance · 966 ha site area · 5 years further time sought to start
- Stage
- Comments closed. Decision due by 2 Mar 2027.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application seeks changes to an already-approved wind farm scheme, including changes to ancillary infrastructure, a wider micrositing allowance of 130m and turbines up to 220m from base to tip. It also seeks a further 5 years to start the development. The record refers to permission 22/0471/S42, while the form identifies 25/0822/S42 as the previous application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/1968/S42?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/1968/S42. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Dumfries and Galloway Council planning portal.
On the street
What neighbours would notice.
- 01
The scheme includes access tracks, borrow pits, battery storage, a temporary construction compound, a substation and associated infrastructure.
- 02
A new or altered vehicle access to a public road is proposed.
- 03
The application seeks changes to where turbines may be sited and allows for larger turbines.
Questions
What earlier applications are linked to this one?
The description says the changes are at variance with conditions of permission 22/0471/S42. The form names 25/0822/S42 as the previous application.
How long would the wind farm operate?
The form states 35 years, described as the operational life of the development.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Access Roads
- Borrow Pit
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Section 42 Variation
- Substation
- Temporary Construction Compound
- Wind Farm Micro Siting Variation
- Wind Turbine
What each tag is based on
- Access Roads
- “FORMATION OF ACCESS TRACKS”
- Borrow Pit
- “BORROW PITS”
- Rail Infrastructure
- “Fell Wind Farm Site Between Blackcraig Wind Farm And Loch Urr 7km To The South Of Moniaive”
- Railway Infrastructure
- “Fell Wind Farm Site Between Blackcraig Wind Farm And Loch Urr 7km To The South Of Moniaive”
- Railway Station
- “Fell Wind Farm Site Between Blackcraig Wind Farm And Loch Urr 7km To The South Of Moniaive”
- Section 42 Variation
- “AT VARIANCE WITH CONDITIONS 2 AND 13”, “AT VARIANCE WITH CONDITION 1 (SECTION 42)”
- Substation
- “SUBSTATION”
- Temporary Construction Compound
- “TEMPORARY CONSTRUCTION COMPOUND”
- Wind Farm Micro Siting Variation
- “CHANGES TO THE ANCILLARY INFRASTRUCTURE OUTWITH THE CONSENTED MICROSITING ALLOWANCE”, “INCREASE THE STATED MICROSITING ALLOWANCE TO 130M”
- Wind Turbine
- “WIND FARM COMPRISING NINE TURBINES”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 2 March.
- Received30 Oct 2026
- Validated30 Oct 2026The council has everything it needs.
- Comments closed20 Nov 2026Usual deadline. Late comments may still count.
- Target decision (next)2 Mar 20274-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- DGY/26/1968/S42
- Address
- Fell Wind Farm Site Between Blackcraig Wind Farm And Loch Urr 7km To The South Of Moniaive
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







