Planning application · EAL/25/00003/SGC
Solar farm with up to approximately 165 Megawatts proposed near Dunbar.
Springfield Solar Farm & Battery Energy Storage System (BESS) Located Approximately 7.8 Km Southeast Of Dunbar
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Landscaping
- Parking Access
- Section 36 Consent
Overview
Why it’s worth watching
A long-duration, utility-scale energy proposal with substantial co-located storage has clear national and local land-use significance. The live council record supplies a useful status check but does not establish the decision outcome.
- Proposed
- A ground-mounted solar farm, battery energy storage system, associated infrastructure, access and landscaping.
- Stage
- Past its target date of 24 Aug 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks consent under Section 36 to construct, install and operate a ground-mounted solar photovoltaic development and a battery energy storage system. It also includes associated infrastructure, access and landscaping. The proposed operational period is up to 40 years, after which the development would be decommissioned.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application EAL/25/00003/SGC?
Follow it on City Scope. This page is checked against the East Lothian Council planning register and shows the latest status, decision and documents for EAL/25/00003/SGC. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the East Lothian Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A ground-mounted solar development would be installed.
- 02
A battery energy storage system would be installed.
- 03
Associated infrastructure, access and landscaping are proposed.
Tags
- Landscaping
- Associated Infrastructure
- Parking Access
- Section 36 Consent
What each tag is based on
- Associated Infrastructure
- “associated infrastructure, access, and landscaping”
- Landscaping
- “associated infrastructure, access, and landscaping”
- Parking Access
- “access”
- Section 36 Consent
- “Section 36 - Construct, install, operate and decommission a ground-mounted solar photovoltaic (PV) development”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received24 Jun 2025
- Validated24 Jun 2025The council has everything it needs.
- Comments closed15 Jul 2025Usual deadline. Late comments may still count.
- Target decision (next)24 Aug 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- EAL/25/00003/SGC
- Address
- Springfield Solar Farm & Battery Energy Storage System (BESS) Located Approximately 7.8 Km Southeast Of Dunbar
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- East Lothian Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







