Planning application25/00005/SGC

Crystal Rig 1 Wind Farm Approx 10km South Of Dunbar And Approx 40km East Of Edinburgh, Within The Lammermuir Hills

Awaiting decisionWorth watchingRenewable Energy & Sustainability

No documents available

Drawings and supporting documents from the council portal will appear here when published.

Received

20 October 2025

Validated

20 October 2025

Planning Signals

2 detected traits

Specific
Section 36 ConsentWind Turbine
AI summary

Up to 10 wind turbines are proposed, with blade tips reaching 200230m and a projected output of over 50MW, to run for 35 years.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application 25/00005/SGC

Crystal Rig 1 Wind Farm Approx 10km South Of Dunbar And Approx 40km East Of Edinburgh, Within The Lammermuir Hills

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Local authority

Up to 10 wind turbines are proposed, with blade tips reaching 200230m and a projected output of over 50MW, to run for 35 years.

Reference
25/00005/SGC
Address
Crystal Rig 1 Wind Farm Approx 10km South Of Dunbar And Approx 40km East Of Edinburgh, Within The Lammermuir Hills
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Local authority
Received
Validated
Last scraped
Record created

Plain-language summary

Up to 10 wind turbines are proposed, with blade tips reaching 200230m and a projected output of over 50MW, to run for 35 years.

As filed with the council

Section 36 - The proposed development comprises of up to 10 turbines with a maximum blade tip height of up to 230m for six turbines and a maximum tip height of up to 200m for the remaining four turbines, with a total capacity of >50 MW. The application seeks an operational period of 35 years.