Application 25/00008/SGC
Between The Proposed Newlands Hill Wind Energy Hub And The 400kV Substation Within The Southern Section Of The Existing Fallago Rig Windfarm
Scoping opinion for a 2.5km 132kV overhead line and cable link for Newlands Hill wind hub, with access track upgrades and tree works.
The record
- Reference
- 25/00008/SGC
- Address
- Between The Proposed Newlands Hill Wind Energy Hub And The 400kV Substation Within The Southern Section Of The Existing Fallago Rig Windfarm
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Local authority
Timeline
- Received
- Validated
- Last scraped
- Record created
What is proposed
Plain-language summary
Scoping opinion for a 2.5km 132kV overhead line and cable link for Newlands Hill wind hub, with access track upgrades and tree works.
As filed with the council
Scoping opinion for proposed section 37 application for Newlands Hill wind energy hub 132KV Connection Project for installation of approximately 2.5 km of 132 kv OHL (Overhead Line) (ECU00006281)