Scoping opinion for a 2.5 km Newlands Hill power line.
Between The Proposed Newlands Hill Wind Energy Hub and The 400kV Substation Within The Southern Section Of The Existing Fallago Rig Windfarm
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Eia Scoping
- Overhead Utility Lines
- Wind Turbine
Overview
Why it’s worth watching
Major renewable energy infrastructure scoping for a 2.5km 132kV overhead line and cable link serving a wind energy hub.
- Proposed
- Approximately 2.5 km of 132 kV overhead line
- Size
- 132 kV connection voltage
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a scoping opinion for a proposed section 37 application for the Newlands Hill wind energy hub 132KV Connection Project. It concerns installing approximately 2.5 km of overhead line between the proposed Newlands Hill wind energy hub and the 400kV substation in the southern section of the existing Fallago Rig windfarm. A scoping opinion sets out what an environmental impact assessment should cover.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application EAL/25/00008/SGC?
Follow it on City Scope. This page is checked against the East Lothian Council planning register and shows the latest status, decision and documents for EAL/25/00008/SGC. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the East Lothian Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
An overhead line is proposed between the Newlands Hill wind energy hub and the substation in the southern section of the existing Fallago Rig windfarm.
Questions
Is this the application to build the line?
The record describes this as a scoping opinion for a proposed section 37 application, rather than the section 37 application itself.
Tags
- Associated Infrastructure
- Eia Scoping
- Overhead Utility Lines
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “access track upgrades and tree works”
- Eia Scoping
- “Scoping opinion for proposed section 37 application”, “ECU00006281”
- Overhead Utility Lines
- “installation of approximately 2.5 km of 132 kv OHL (Overhead Line)”
- Wind Turbine
- “Newlands Hill wind energy hub”, “Scoping opinion for proposed section 37 application for Newlands Hill wind energy hub”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received25 Nov 2025
- Validated25 Nov 2025The council has everything it needs.
- Comments closed16 Dec 2025Usual deadline. Late comments may still count.
- Target decision25 Jan 20262-month target for local developments.
- DecisionDecided
The record
- Reference
- EAL/25/00008/SGC
- Address
- Between The Proposed Newlands Hill Wind Energy Hub And The 400kV Substation Within The Southern Section Of The Existing Fallago Rig Windfarm
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- East Lothian Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.