A 6km overhead line proposed between Newlands Hill and Fallago Rig.
Newlands Hill Wind Farm
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Eia Scoping
- Overhead Utility Lines
- Rail Infrastructure
- Railway Infrastructure
Overview
Why it’s worth watching
Major 6km overhead line and associated works linking a wind energy hub to a substation, with clear infrastructure and renewable energy significance.
- Today
- The existing Fallago Rig Wind Farm includes a 400kV substation in its southern section.
- Proposed
- A wooden-pole overhead line, approximately 6km long, with associated cabling, accesses and laydown areas.
- Size
- 132 kV line voltage · 6 km approximate line length
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The proposal is for a 132kV overhead line carried on wooden poles, approximately 6km long. It would connect the proposed Newlands Hill Wind Energy Hub to the 400kV substation in the southern section of the existing Fallago Rig Wind Farm. Associated works include cabling, access routes and laydown areas. The description gives the related reference ECU00006201.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application EAL/25/00009/SCR?
Follow it on City Scope. This page is checked against the East Lothian Council planning register and shows the latest status, decision and documents for EAL/25/00009/SCR. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the East Lothian Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A wooden-pole overhead line is proposed between the Newlands Hill Wind Energy Hub and the substation.
- 02
The works include cabling, access routes and laydown areas.
Questions
What does the application refer to?
The description gives the related reference ECU00006201.
Tags
- Associated Infrastructure
- Eia Scoping
- Overhead Utility Lines
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “associated ancillary works including cabling, accesses and laydown areas”
- Eia Scoping
- “The Proposed Development consists of a 132kV wood pole overhead line (OHL) (approximately 6km in length) and associated ancillary works including cabling, accesses and laydown areas) between the proposed Newlands Hill...”
- Overhead Utility Lines
- “a 132kV wood pole overhead line (OHL) (approximately 6km in length)”
- Rail Infrastructure
- “Newlands Hill Wind Farm”
- Railway Infrastructure
- “Newlands Hill Wind Farm”
- Railway Station
- “Newlands Hill Wind Farm”
- Wind Turbine
- “Newlands Hill Wind Farm”, “Newlands Hill Wind Energy Hub”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received27 Jul 2025
- Validated27 Jul 2025The council has everything it needs.
- Comments closed17 Aug 2025Usual deadline. Late comments may still count.
- Target decision27 Sept 20252-month target for local developments.
- DecisionDecided
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- EAL/25/00009/SCR
- Address
- Newlands Hill Wind Farm
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- East Lothian Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.