Planning applicationEAL/25/00009/SCR

Newlands Hill Wind Farm

DecidedWorth watchingRenewable Energy & Sustainability
Planning document
1 / 4
Received

27 July 2025

Validated

27 July 2025

Planning Signals

7 detected traits

Specific
Associated InfrastructureEia ScopingOverhead Utility LinesRail InfrastructureRailway InfrastructureRailway Station
AI summary

6km 132kV wood-pole overhead line linking Newlands Hill Wind Energy Hub to Fallago Rig substation, with temporary tracks and laydown areas.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EAL/25/00009/SCR

Newlands Hill Wind Farm

DecidedRenewable Energy, EV & Heat PumpsReceived East Lothian Council

6km 132kV wood-pole overhead line linking Newlands Hill Wind Energy Hub to Fallago Rig substation, with temporary tracks and laydown areas.

Reference
EAL/25/00009/SCR
Address
Newlands Hill Wind Farm
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
East Lothian Council
Received
Validated
Last scraped
Record created
Latitude
55.9549
Longitude
-2.7808

Plain-language summary

6km 132kV wood-pole overhead line linking Newlands Hill Wind Energy Hub to Fallago Rig substation, with temporary tracks and laydown areas.

As filed with the council

The Proposed Development consists of a 132kV wood pole overhead line (OHL) (approximately 6km in length) and associated ancillary works including cabling, accesses and laydown areas) between the proposed Newlands Hill Wind Energy Hub and the 400kV substation within the Southern section of the existing Fallago Rig Windfarm. (ECU00006201)