Newlands Hill Wind Farm
6km 132kV wood-pole overhead line linking Newlands Hill Wind Energy Hub to Fallago Rig substation, with temporary tracks and laydown areas.
The record
- Reference
- 25/00009/SCR
- Address
- Newlands Hill Wind Farm
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Local authority
Timeline
- Received
- Validated
- Last scraped
- Record created
What is proposed
Plain-language summary
6km 132kV wood-pole overhead line linking Newlands Hill Wind Energy Hub to Fallago Rig substation, with temporary tracks and laydown areas.
As filed with the council
The Proposed Development consists of a 132kV wood pole overhead line (OHL) (approximately 6km in length) and associated ancillary works including cabling, accesses and laydown areas) between the proposed Newlands Hill Wind Energy Hub and the 400kV substation within the Southern section of the existing Fallago Rig Windfarm. (ECU00006201)