Skip to content

Planning application · EAL/25/00771/P

EAL/25/00771/PDecidedWorth watching

Renewable electro-hydrogen energy centre proposed at Pencaitland Maltings.

Pencaitland Maltings Pencaitland Tranent EH34 5DQ

Haddington and Lammermuir ward · East Lothian Council

Preview alerts near this site

Free preview. £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Large 7/10
Tags
  • Associated Infrastructure
  • Electro Hydrogen Energy Centre
  • Energy Centre
  • Industrial Logistics
  • New Build

Overview

Why it’s worth watching

Scale 7 renewable electro-hydrogen energy centre with associated site works, likely a notable industrial/energy development.

Today
A brownfield development of an existing agro-industrial site.
Proposed
A renewable electro-hydrogen energy centre and associated works.
Size
251.66 m² site area
Stage
Decided: Decided.

The council writes only to properties within 20 metres of an application site. Who is told

Advert

In plain English

The application seeks planning permission for a renewable electro-hydrogen energy centre and associated works at Pencaitland Maltings. The form says this is a supplementary or additional full application following a recent grant of permission at the same site, to change the technology and amend the built environment. It does not give the earlier application reference.

Written with AI from the application form and the council record.

Keep reading

Track this application

How do I track planning application EAL/25/00771/P?

Follow it on City Scope. This page is checked against the East Lothian Council planning register and shows the latest status, decision and documents for EAL/25/00771/P. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the East Lothian Council planning portal.

Set up a planning alert