Planning application · EALING/261857CND
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Overview
- Stage
- Past its target date of 30 Jun 2026.
As lodged with the council
Details of external artificial lighting pursuant to partially discharge condition 52 of planning permission ref: 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Keep reading
Track this application
How do I track planning application EALING/261857CND?
Follow it on City Scope. This page is checked against the Ealing planning register and shows the latest status, decision and documents for EALING/261857CND. To comment on the application, use the Ealing planning portal.
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received5 May 2026
- Validated5 May 2026The council has everything it needs.
- Comments closed26 May 2026Usual deadline. Late comments may still count.
- Target decision (next)30 Jun 20268-week target for minor and other applications.
- DecisionNot yet
Planning terms
- Major development
- In England, 10 or more homes, 1,000 m² or more of new floor space, or a site of 1 hectare or more. These have a 13-week target.
- Use class C3
- Dwellinghouses: homes lived in by one household or a small group.
- Public realm
- Streets, squares and paths open to everyone.
The record
- Reference
- EALING/261857CND
- Address
- Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
- Status
- Pending Consideration
- Authority
- Ealing
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Pitshanger
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.