Planning applicationEAY/25/0029/NMV

Land Off Ayr Road Coylton A70 From B730 To U74 Bardarroch Ochiltree East Ayrshire

DecidedLegal / Administrative
Official records · coverage in progress

621 of 673 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 52 records from that period are still being added or checked.

Proposals and decisions come from East Ayrshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

12 August 2025

Validated

18 August 2025

Planning Signals

8 detected traits

Works
Boundary TreatmentHouse Extension
Specific
Ancillary StructureBattery StorageEnergy CentreNon Material Variation
AI summary

Non-material changes to HV yardnew comms house arrangement, revised noise/acoustic fencing, access and SUDs pond shape; battery blocks removed.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EAY/25/0029/NMV

Land Off Ayr Road Coylton A70 From B730 To U74 Bardarroch Ochiltree East Ayrshire

DecidedLegal / AdministrativeReceived East Ayrshire Council

Non-material changes to HV yardnew comms house arrangement, revised noise/acoustic fencing, access and SUDs pond shape; battery blocks removed.

Reference
EAY/25/0029/NMV
Address
Land Off Ayr Road Coylton A70 From B730 To U74 Bardarroch Ochiltree East Ayrshire
Status
Decided
Category
Legal / Administrative
Impact scale
6/10
Authority
East Ayrshire Council
Received
Validated
Last scraped
Record created
Latitude
55.4464
Longitude
-4.4293

Plain-language summary

Non-material changes to HV yardnew comms house arrangement, revised noise/acoustic fencing, access and SUDs pond shape; battery blocks removed.

As filed with the council

Non-material variation to planning consent 23/0580/PP comprising; extension of the High Voltage (HV) Yard equipment and HV Yard, reorganisation of ancillary buildings and kit to the western elevation, including: two larger Comms House buildings alternated for four smaller buildings; and the removal of proposed battery blocks from the southwest boundary, Relocation of internal noise attention fence, which runs around the perimeter of the battery blocks, adjustment to access track layout, amendment of perimeter security/acoustic fence, amendment to the shape of the SUDs Pond