Planning application · EAY/25/0335/HS
Hydrogen production and storage proposed at Whitelee.
Whitelee Green Hydrogen Project Lochgoin Fenwick Kilmarnock KA3 6EX
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 6/10
- Electro Hydrogen Energy Centre
- Hydrogen Production Facility
Overview
Why it’s worth watching
A 10MW electrolytic green hydrogen production scheme at the Whitelee site with on-site water storage and road export, an infrastructure proposal of clear regional interest.
- Proposed
- A hydrogen production facility using two 5MW electrolyser trains, with hydrogen taken away in road-going tube trailers.
- Size
- 4 tonnes hydrogen proposed to be present
- Stage
- Decided on 26 Aug 2025: Withdrawn.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks hazardous substances consent for a facility to make hydrogen by splitting water, using two 5MW electrolyser trains. Hydrogen would be taken from the site in road-going tube trailers. The application was withdrawn.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
621 of 673 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 52 records from that period are still being added or checked.
Proposals and decisions come from East Ayrshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application EAY/25/0335/HS?
Follow it on City Scope. This page is checked against the East Ayrshire Council planning register and shows the latest status, decision and documents for EAY/25/0335/HS. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the East Ayrshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Hydrogen would be taken away in road-going tube trailers. The form estimates six HGVs per day in its transport base case.
- 02
The form says trailer movements would be restricted to 0700hrs to 2300hrs.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Electro Hydrogen Energy Centre
- Hydrogen Production Facility
What each tag is based on
- Electro Hydrogen Energy Centre
- “2 x 5MW PEM electrolyser trains”
- Hydrogen Production Facility
- “produce hydrogen for sale”
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 26 August 2025.
- Received26 Jun 2025
- Validated14 Jul 2025The council has everything it needs.
- Comments closed4 Aug 2025Usual deadline. Late comments may still count.
- Target decision14 Sept 20252-month target for local developments.
- Decision26 Aug 2025Withdrawn.
The record
- Reference
- EAY/25/0335/HS
- Address
- Whitelee Green Hydrogen Project Lochgoin Fenwick Kilmarnock KA3 6EX
- Status
- Decided
- Council decision
- Withdrawn
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- East Ayrshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Annick
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





