Planning application · EAY/26/0001/S36VAR
Changes to the approved 12-turbine Knockkippen Wind Farm.
Knockkippen Wind Farm Near Patna
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Section 36 Consent
- Substation
- Wind Turbine
Overview
Why it’s worth watching
Proposed variation to an existing Section 36 wind farm consent involving relocation of the approved substation and BESS compound approximately 1.5km south-east.
- Today
- The approved scheme includes a substation and BESS compound.
- Proposed
- Move the substation and BESS compound about 1.5KM south-east, beside the consented construction compound.
- Size
- 12 turbines in approved scheme
- Stage
- Past its target date of 14 Jun 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application seeks to vary the consent for the Knockkippen Wind Farm, approved under reference 22/0003/S36. It would move the approved substation and battery energy storage system (BESS) compound about 1.5KM south-east, beside the consented construction compound. The wind farm scheme includes 12 turbines with a maximum blade tip height of up to 180m.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
621 of 673 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 52 records from that period are still being added or checked.
Proposals and decisions come from East Ayrshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application EAY/26/0001/S36VAR?
Follow it on City Scope. This page is checked against the East Ayrshire Council planning register and shows the latest status, decision and documents for EAY/26/0001/S36VAR. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the East Ayrshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The approved substation and BESS compound would move about 1.5KM south-east, beside the consented construction compound.
Questions
Which earlier consent does this application relate to?
It seeks to vary consent 22/0003/S36.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Section 36 Consent
- Substation
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Section 36 Consent
- “Consultation under S36c of the Electricity Act 1989”
- Substation
- “relocation of the approved sub station”
- Wind Turbine
- “windfarm comprising 12 wind turbines”
As lodged
The drawings.
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received14 Apr 2026
- Validated14 Apr 2026The council has everything it needs.
- Comments closed5 May 2026Usual deadline. Late comments may still count.
- Target decision (next)14 Jun 20262-month target for local developments.
- DecisionNot yet
The record
- Reference
- EAY/26/0001/S36VAR
- Address
- Knockkippen Wind Farm Near Patna
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- East Ayrshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.