Planning application · EAY/26/0099/PP
Glen Water Wind Farm could add six wind turbines up to 200m to tip, with access tracks and supporting infrastructure.
Glen Water Wind Farm Approximately 2.5km North Of Edge New Cumnock and 3.5km East Of Cumnock, To The North Of The A76
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Access Roads
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Wind Turbine
Overview
Why it’s worth watching
The application seeks construction and operation of a six-turbine wind farm up to 200m tip height with associated infrastructure.
- Type
- Planning permission
- Stage
- Past its target date of 16 May 2026.
The council writes only to properties within 20 metres of an application site. Who is told
As lodged with the council
The construction and operation of a wind farm (known as Glen Water Wind Farm), comprising six wind turbines up to 200m in height to tip with associated and ancillary infrastructure
The headline is a plain-English summary written with AI from the council record.
Keep reading
Official records · coverage in progress
621 of 673 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 52 records from that period are still being added or checked.
Proposals and decisions come from East Ayrshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application EAY/26/0099/PP?
Follow it on City Scope. This page is checked against the East Ayrshire Council planning register and shows the latest status, decision and documents for EAY/26/0099/PP. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the East Ayrshire Council planning portal.
The impact
What the application says.
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Access Roads
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Wind Turbine
- Wind Turbine Count 8
What each tag is based on
- Access Roads
- “access tracks”
- Associated Infrastructure
- “associated and ancillary infrastructure”, “access tracks”
- Rail Infrastructure
- “Glen Water Wind Farm Approximately 2.5km North Of Edge New Cumnock And 3.5km East Of Cumnock, To The North Of The A76”
- Railway Infrastructure
- “Glen Water Wind Farm Approximately 2.5km North Of Edge New Cumnock And 3.5km East Of Cumnock, To The North Of The A76”
- Wind Turbine
- “wind farm”, “six wind turbines”
- Wind Turbine Count 8
- “six wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received5 Mar 2026
- Validated16 Mar 2026The council has everything it needs.
- Comments closed6 Apr 2026Usual deadline. Late comments may still count.
- Target decision (next)16 May 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- EAY/26/0099/PP
- Address
- Glen Water Wind Farm Approximately 2.5km North Of Edge New Cumnock And 3.5km East Of Cumnock, To The North Of The A76
- Status
- Registered
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- East Ayrshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







