Planning applicationERF/2025/0439/TP

Land At Melowther Hill (adjacent To Dunwan Dam And 2km South-west Of Eaglesham) East Renfrewshire

RegisteredWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

602 of 606 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 4 records from that period are still being added or checked.

Proposals and decisions come from East Renfrewshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

29 July 2025

Validated

15 August 2025

Planning Signals

8 detected traits

Specific
Access RoadsAssociated InfrastructureRail InfrastructureRailway InfrastructureRailway StationSubstation
Application Insights

No form insights available yet.

AI summary

Erect up to five large wind turbines with sub-station building, access tracks and new junction widening at Strathaven Road.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ERF/2025/0439/TP

Land At Melowther Hill (adjacent To Dunwan Dam And 2km South-west Of Eaglesham) East Renfrewshire

RegisteredRenewable Energy, EV & Heat PumpsReceived East Renfrewshire Council

Erect up to five large wind turbines with sub-station building, access tracks and new junction widening at Strathaven Road.

Reference
ERF/2025/0439/TP
Address
Land At Melowther Hill (adjacent To Dunwan Dam And 2km South-west Of Eaglesham) East Renfrewshire
Status
Registered
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
East Renfrewshire Council
Received
Validated
Last scraped
Record created
Latitude
55.7209
Longitude
-4.2877

Plain-language summary

Erect up to five large wind turbines with sub-station building, access tracks and new junction widening at Strathaven Road.

As filed with the council

Erection of five wind turbines (119m to hub height and up to 200m to tip height) and associated infrastructure including sub-station building, access tracks; construction of access track; widening of junction at Strathaven Road (Major)