Planning applicationERF/2025/0617/TP

Waitrose 2 Greenlaw Place Newton Mearns East Renfrewshire G77 6GW

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

602 of 606 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 4 records from that period are still being added or checked.

Proposals and decisions come from East Renfrewshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

15 October 2025

Validated

23 October 2025

Planning Signals

4 detected traits

Works
Roof Works
Specific
Chiller InstallationMaintenance AccessMechanical Plant
Application Insights

No form insights available yet.

AI summary

Roof plant changes at the Waitrose site: three air-to-water heat pumps replace two chillers, with free cooling DAC and updated roof access/walkway.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ERF/2025/0617/TP

Waitrose 2 Greenlaw Place Newton Mearns East Renfrewshire G77 6GW

DecidedRenewable Energy, EV & Heat PumpsReceived East Renfrewshire Council

Roof plant changes at the Waitrose site: three air-to-water heat pumps replace two chillers, with free cooling DAC and updated roof access/walkway.

Reference
ERF/2025/0617/TP
Address
Waitrose 2 Greenlaw Place Newton Mearns East Renfrewshire G77 6GW
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
5/10
Authority
East Renfrewshire Council
Received
Validated
Last scraped
Record created
Latitude
55.7832
Longitude
-4.3491

Plain-language summary

Roof plant changes at the Waitrose site: three air-to-water heat pumps replace two chillers, with free cooling DAC and updated roof access/walkway.

As filed with the council

Installation of three air cooled chiller/air-to-water heat pumps on roof in place of two air cooled chillers; installation of a free cooling DAC at roof level; alterations to existing roof walkway and stair access to upper roof level.