Planning application · ERF/2025/0702/CLU
132.6kWp of rooftop solar proposed at Tesco in Barrhead.
Tesco Stores 60 Kelburn Street Barrhead East Renfrewshire G78 1LR
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Roof Mounted Solar Panels
Overview
- Today
- The site is a Class 1 retail building.
- Proposed
- A solar photovoltaic array on the roof, with equipment sited there.
- Size
- 132.6 kWp solar array capacity
- Stage
- Decided on 3 Dec 2025: Granted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought a certificate of lawfulness for solar panels on the roof of the Tesco store in Barrhead. The certificate was granted. The application says equipment would be placed on the roof to limit its effect on the building’s appearance and the area.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
602 of 606 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 4 records from that period are still being added or checked.
Proposals and decisions come from East Renfrewshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ERF/2025/0702/CLU?
Follow it on City Scope. This page is checked against the East Renfrewshire Council planning register and shows the latest status, decision and documents for ERF/2025/0702/CLU. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the East Renfrewshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Solar panels would be installed on the roof.
- 02
Equipment would also be sited on the roof.
Questions
What does a certificate of lawfulness do?
It asks the council to confirm whether the proposed work would be lawful. The certificate was granted.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Roof Mounted Solar Panels
What each tag is based on
- Roof Mounted Solar Panels
- “solar photovoltaic arrays on the roof”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 3 December 2025.
- Received25 Nov 2025
- Validated25 Nov 2025The council has everything it needs.
- Comments closed16 Dec 2025Usual deadline. Late comments may still count.
- Target decision25 Jan 20262-month target for local developments.
- Decision3 Dec 2025Granted.
The record
- Reference
- ERF/2025/0702/CLU
- Address
- Tesco Stores 60 Kelburn Street Barrhead East Renfrewshire G78 1LR
- Status
- Decided
- Council decision
- Granted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- East Renfrewshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Barrhead, Liboside and Uplawmoor
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.