Planning applicationERF/2025/0763/TP

Myres Hill Wind Turbine Test Site Over Enoch Road Eaglesham East Renfrewshire

RegisteredWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

602 of 606 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 4 records from that period are still being added or checked.

Proposals and decisions come from East Renfrewshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

19 December 2025

Validated

19 December 2025

Planning Signals

2 detected traits

Specific
Met MastWind Turbine
Application Insights

No form insights available yet.

AI summary

Plans for a 50kW Myriad wind turbine on the Myres Hill test site, with a 30m meteorological mast under amended details.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ERF/2025/0763/TP

Myres Hill Wind Turbine Test Site Over Enoch Road Eaglesham East Renfrewshire

RegisteredRenewable Energy, EV & Heat PumpsReceived East Renfrewshire Council

Plans for a 50kW Myriad wind turbine on the Myres Hill test site, with a 30m meteorological mast under amended details.

Reference
ERF/2025/0763/TP
Address
Myres Hill Wind Turbine Test Site Over Enoch Road Eaglesham East Renfrewshire
Status
Registered
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
East Renfrewshire Council
Received
Validated
Last scraped
Record created
Latitude
55.6916
Longitude
-4.2783

Plain-language summary

Plans for a 50kW Myriad wind turbine on the Myres Hill test site, with a 30m meteorological mast under amended details.

As filed with the council

Installation of a 50 kilowatt Myriad Wind turbine (24.5m to highest blade tip) and a 30m high meteorological mast on the existing Myres Hill wind turbine test site (amended plans of proposed turbine received and amended description)