Planning applicationERF/2026/0469/PAR

Williamwood Railway Station Dorian Drive Clarkston Glasgow East Renfrewshire G76 7NP

UnknownPublic Realm & Community Projects
Official records · coverage in progress

602 of 606 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 4 records from that period are still being added or checked.

Proposals and decisions come from East Renfrewshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

18 August 2026

Validated

18 August 2026

Council decision
Prior Approval Required - Granted
Decision issued

Planning Signals

9 detected traits

Specific
Bridge SafetyHandrailsPedestrian InfrastructurePrior NotificationRail InfrastructureRailway Bridge Replacement Footbridge
AI summary

Footbridge alterations: parapet extensions, steel painting, GRP tread replacements, new mesh and double-height handrails.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ERF/2026/0469/PAR

Williamwood Railway Station Dorian Drive Clarkston Glasgow East Renfrewshire G76 7NP

UnknownPublic Realm & Community ProjectsReceived East Renfrewshire Council

Footbridge alterations: parapet extensions, steel painting, GRP tread replacements, new mesh and double-height handrails.

Reference
ERF/2026/0469/PAR
Address
Williamwood Railway Station Dorian Drive Clarkston Glasgow East Renfrewshire G76 7NP
Status
Unknown
Council decision
Prior Approval Required - Granted
Decision issued
Category
Public Realm & Community Projects
Impact scale
4/10
Authority
East Renfrewshire Council
Received
Validated
Last scraped
Record created
Latitude
55.7939
Longitude
-4.2902

Plain-language summary

Footbridge alterations: parapet extensions, steel painting, GRP tread replacements, new mesh and double-height handrails.

As filed with the council

Alterations/repairs to footbridge connecting platforms involving: parapet extensions on staircase; painting of steel work; existing timber tread steps and landings to be replaced with Dura Slab GRP treads; existing mesh surrounding lower level staircases and landings to be replaced; and existing handrails to be removed and double height handrails installed (prior approval)